background image

                                                                

Assembly Instructions

 

14X30X12 Round Utility  

 

 
V2.3 

Please Do NOT Return Assembly to Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products directly 

Customer Service 800-447-7079 or 203-877-7070 

1

ASSEMBLY INSTRUCTIONS 

ROUND UTILITY 14Wx30Lx12H 

 

Congratulations! 

 

Congratulations on your purchase of a Round Style 
Portable Building by MDM Products LLC.  With proper 
installation, use, and maintenance, your new unit will 
provide many years of good and suitable service.  Your 
new Rhino Shelter portable building is a combination of 
excellent engineering and well thought out design.  The 
unit is comprised of a rigid tubular frame, covered with a 
long life polyethylene cover and double door ends.   
 
The multiple part frame assembly is pre-drilled for easy 
insertion of hardware to assemble.  The tubing is made 
from high-grade galvanized steel tubing, to resist 
moisture and oxidation over the life of the shelter.  The 
fabric components are made from ASTM-5 approved 
polyethylene materials.  The cover is UV protected for 
exposure to the sunlight. 
 
It is suggested that you read the assembly instructions 
completely before you begin.  This will help attain the 
best results for your installation.   

 

SAFETY WARNING 

The installation of this unit must conform to the 

requirements of all authorities having jurisdiction in 

your specific local area.  In the absence of such 

requirements, the installation must conform to the 

provided assembly and installation instructions.  

MDM Products LLC will not be responsible for failure 

to comply with any requirements in a given local 

area.  Consequential damages or injuries caused by 

improper installation, alteration, or improper use are 

strictly that of the user.  Unit MUST be cleared of All 

Snow Accumulation immediately to avoid overload.  

Unit is not to be used for occupancy for any length 

of time.  No running internal combustion engines, 

open flames, or contact with heated surfaces are 

allowed. 

 

For installation assistance or Customer Service, please 
call 800-447-7079 or 203-877-7070, 8AM-5PM EST. 
Cartons should be inspected upon delivery from carrier, 
and any evident damages should be noted on the bill of 
lading before signing.   If upon opening the cartons 
hidden damage is noted, contact carrier or its agent 
immediately.  Claims for shipping damage MUST be 
made with the shipping company.  An inspection of the 
goods will most likely be required.  Do not discard 
packing or any components before the freight company’s 
inspection.  All claims for freight damage must be made 

with 15 days of receipt of the goods in accordance with 
ICC regulations. 
 

ASSEMBLY PROCEDURE 

 
The proper sequence and steps to install this unit will 
produce a proper and good installation.  Failure to read 
and follow these guidelines may result in an improper 
installation and will void all warranty and protection the 
owner is entitled to with the product.  The steps to be 
undertaken are: 
 
1.  Perform an inventory check before beginning to be 

certain all components are available for installation. 

2.  Prepare location and place both unit boxes near 

location sight. 

3.  Assemble seven (7) arches of unit 
4.  Assemble unit end arch, first interior arch, and Wind 

Braces with first top, base, and side rail sections. 

5.  Add additional arch assemblies with each section of 

base rails and side rails. 

6.  Place frame into desired position and level frame 

both end-to-end and side-to-side.  

Level

 and adjust 

unit in both width and alignment.  Measure interior of 
frame feet across opposite corners and square  

7.  Anchor frame assembly to ground with provided 

anchors, u-bolts and drive rod provided. 

8.  Install two(2) doors on both ends of frame assembly. 
9.  Install Main Cover over frame assembly. 
 

TOOLS REQUIRED 

 
The following hand tools will be needed for proper 
installation of your new Rhino Shelter unit: 

9/16” Open End Wrench 

9/16” Socket or Box Wrench 

Large Flat Tip Screwdriver 

Maul or Sledgehammer 

2 foot Level 

10 foot Step Ladder 

 

INVENTORY CHECK 

 

Start installation procedure by removing all components 
from packaging and ensure all components are present 
 
Qty

Part Number 

Description 

RUC-9000 

Main Unit Cover 

DZD-7002 

End Panel Door with Zippers 

4 EUL-5021 

End 

Upright 

w/Foot 

RC-5020 

Right Side Crest Tube 

LC-5021 

Left Side Crest Tube –swedged 

14 

MC-9000 

Middle Connect Tube  

10 

CSU-5020 

Center Straight Uprights 

Summary of Contents for PB143012RGN

Page 1: ...d be inspected upon delivery from carrier and any evident damages should be noted on the bill of lading before signing If upon opening the cartons hidden damage is noted contact carrier or its agent immediately Claims for shipping damage MUST be made with the shipping company An inspection of the goods will most likely be required Do not discard packing or any components before the freight company...

Page 2: ...47 7079 or 203 877 7070 2 Base Cross Rail Poles Side Ridge Cross Rail Poles Center Straight Uprights Mid Connect Tube Note All Side and Base Ridge Poles MUST be on Inside of Arch Frame Members Top Ridge Poles MUST be on Outside of Arch Frame members except at Ends See Frame P u a Interior Arches End Arch with Foot Top Ridge Poles Wind Brace SITE PREPARATION Select a level or as close to level as p...

Page 3: ...completely until the frame is completed and set in place Attach one end upright mid tube connect sub assembly to each end of a pair to assembled crest tubes to construct each end arch Qty 2 Attach one Center Upright Mid Connect Tube sub assembly to each side of the remaining Crest Tube pairs to construct the interior arches Qty 5 Step 2 Assemble each of four 4 Corner Wind Braces from section A B w...

Page 4: ...hten bolts that connect the Cross Rails to the End Arches They must be removed for proper for End Panel Zippered Door installation For each arch that is added add a side cross rail and the top ridge rail by inserting a swedged end cross rail SCR 5030 into the prior pole end By adding cross rails at base side and top ridge the arches will integrate into a strong frame assembly For the other End Arc...

Page 5: ...bers to Cross Rails along base side and top Do not over tighten or oval tubing After hardware is tightened insert plastic end plugs 14 2 3 8 15 1 1 8 into all open ends of frame members NOTE Frame must be anchored before installing any doors or cover Each Rhino Shelter 14x30x12 building comes with 14 EARTH CABLE ANCHORS with U bolts and nuts These versatile anchors allow the frame to be secured to...

Page 6: ... tighten Do not attach to base cross rails Ensure there is no slack in the cable Slack can be removed by wrapping the cable around the tie down rail Every Arch MUST be secured END PANEL INSTALLATION Note End panels MUST be installed before installing Main Cover onto frame Step1 Remove Carriage bolts from the Top Ridge Rail and the two Upper Side Cross Rails Install End Panel Door w Zippers DZD 700...

Page 7: ...rnbuckle turn buckle should be loosened all the way and attach the turnbuckle to the hole in the foot of the end arch Hold the end of the unsecured rope and apply downward pressure with a foot to remove excess slack Re adjust gathered material evenly along inside edge of door rope slot This step is key to getting a good door fit Tie off the end off the rope to a second turnbuckle fully expanded at...

Page 8: ...not flap around in the wind but not so tight that it tears the material cover The fabric backed PE fabric of Rhino Shelter units does not stretch If you pull it so tight that the fabric is stretched a small amount of additional stress from wind or contact can cause premature tears and material failure Only tighten cover enough to remove valleys between arch assemblies Do Not over tighten Once the ...

Page 9: ...rall adjustment If necessary readjust rope tie off on turnbuckle as needed to tighten or loosen as needed Cleaning cover and doors can be cleaned with a mixture of light detergent and water A soft bristle brush with the mixture can be used to loosen any hard dirt mold or buildup on the cover After cleansing the cover should be rinsed thoroughly to avoid any chemical reaction from residual detergen...

Reviews: