Assembly Instructions
14X30X12 Round Utility
4
CW-2800A
Corner Wind Brace A
4
CW-2800B
Corner Wind Brace B
25
SCR-5030
Swedged Side/Base Ridge Poles
5
ECR-5031
End Cross Poles – plain ends
8 TB-3004
Turnbuckles
35
CBN-3005-3
Carriage Bolts – 3 1/4”
14
CBN-3005-2
Carriage Bolts – 2 1/8”
4
CBN-3005-1
Carriage Bolts – 1 3/4”
53 CBN-3005-N 9/16”
Nuts
45
CBN-3005-WC Washers – 3/8” Cupped
8
CBN-3000-WF Washers – 3/8” Flat
2
R-3003
3/16” Rope
14 DBA-3000
Earth
Cable
Anchors
14
UB-3002
U Bolts with Nuts
1
DR-3001
36” Drive Rod for Anchors
4
EP-1000
1-5/8” Plastic End Plugs
10
EP-1001
1” Plastic End Plugs
V2.3
Please Do NOT Return Assembly to Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products directly
Customer Service 800-447-7079 or 203-877-7070
2
Base Cross Rail Poles
Side Ridge
Cross Rail
Poles
Center Straight Uprights
Mid Connect Tube
Note: All Side and Base Ridge Poles MUST be
on Inside of Arch Frame Members. Top Ridge
Poles MUST be on Outside of Arch Frame
members, except at Ends. See Frame
P
u
a
Interior Arches
End Arch with Foot
Top Ridge
Poles
Wind Brace
SITE PREPARATION
Select a level or as close to level as practical location for
your Rhino Shelter unit. The unit should be placed on a
base of materials suitable for the storage load to be
protected. The unit should not be located under trees,
which will shed hard fruit such as apples, walnuts, or
heavy pine cones. The cover of your unit will protect
against normally leaves and light debris, however large
branches or other falling items may cause puncture or
tears in the cover material.
Take notice of drainage near and around your intended
location. Water draining from the surrounding terrain