background image

                                                                

Assembly Instructions

 

14X30X12 Round Utility  

 

 

CW-2800A 

Corner Wind Brace A 

CW-2800B 

Corner Wind Brace B 

25 

SCR-5030 

Swedged Side/Base Ridge Poles

ECR-5031 

End Cross Poles – plain ends 

8 TB-3004 

Turnbuckles 

35 

CBN-3005-3 

Carriage Bolts – 3 1/4” 

14 

CBN-3005-2 

Carriage Bolts – 2 1/8” 

CBN-3005-1 

Carriage Bolts – 1 3/4” 

53 CBN-3005-N  9/16” 

Nuts 

45 

CBN-3005-WC  Washers – 3/8” Cupped 

CBN-3000-WF  Washers – 3/8” Flat 

R-3003 

3/16” Rope  

14 DBA-3000 

Earth 

Cable 

Anchors 

14 

UB-3002 

U Bolts with Nuts 

DR-3001 

36” Drive Rod for Anchors 

EP-1000 

1-5/8” Plastic End Plugs 

10 

EP-1001 

1” Plastic End Plugs 

 

 
V2.3 

Please Do NOT Return Assembly to Dealer or Store. For All Assembly Questions or Shortages Please Call MDM Products directly 

Customer Service 800-447-7079 or 203-877-7070 

2

 

 

Base Cross Rail Poles 

Side Ridge 
Cross Rail  
Poles 

Center Straight Uprights

Mid Connect Tube 

Note: All Side and Base Ridge Poles MUST be 
on Inside of Arch Frame Members.  Top Ridge 
Poles MUST be on Outside of Arch Frame 
members, except at Ends.  See Frame 

P
u
a

Interior Arches 

End Arch with Foot 

Top Ridge 
Poles 

Wind Brace 

 

  

SITE PREPARATION 

 

Select a level or as close to level as practical location for 
your Rhino Shelter unit.  The unit should be placed on a 
base of materials suitable for the storage load to be 
protected.  The unit should not be located under trees, 
which will shed hard fruit such as apples, walnuts, or 

heavy pine cones.  The cover of your unit will protect 
against normally leaves and light debris, however large 
branches or other falling items may cause puncture or 
tears in the cover material. 
 
Take notice of drainage near and around your intended 
location.  Water draining from the surrounding terrain 

Summary of Contents for PB143012RGN

Page 1: ...d be inspected upon delivery from carrier and any evident damages should be noted on the bill of lading before signing If upon opening the cartons hidden damage is noted contact carrier or its agent immediately Claims for shipping damage MUST be made with the shipping company An inspection of the goods will most likely be required Do not discard packing or any components before the freight company...

Page 2: ...47 7079 or 203 877 7070 2 Base Cross Rail Poles Side Ridge Cross Rail Poles Center Straight Uprights Mid Connect Tube Note All Side and Base Ridge Poles MUST be on Inside of Arch Frame Members Top Ridge Poles MUST be on Outside of Arch Frame members except at Ends See Frame P u a Interior Arches End Arch with Foot Top Ridge Poles Wind Brace SITE PREPARATION Select a level or as close to level as p...

Page 3: ...completely until the frame is completed and set in place Attach one end upright mid tube connect sub assembly to each end of a pair to assembled crest tubes to construct each end arch Qty 2 Attach one Center Upright Mid Connect Tube sub assembly to each side of the remaining Crest Tube pairs to construct the interior arches Qty 5 Step 2 Assemble each of four 4 Corner Wind Braces from section A B w...

Page 4: ...hten bolts that connect the Cross Rails to the End Arches They must be removed for proper for End Panel Zippered Door installation For each arch that is added add a side cross rail and the top ridge rail by inserting a swedged end cross rail SCR 5030 into the prior pole end By adding cross rails at base side and top ridge the arches will integrate into a strong frame assembly For the other End Arc...

Page 5: ...bers to Cross Rails along base side and top Do not over tighten or oval tubing After hardware is tightened insert plastic end plugs 14 2 3 8 15 1 1 8 into all open ends of frame members NOTE Frame must be anchored before installing any doors or cover Each Rhino Shelter 14x30x12 building comes with 14 EARTH CABLE ANCHORS with U bolts and nuts These versatile anchors allow the frame to be secured to...

Page 6: ... tighten Do not attach to base cross rails Ensure there is no slack in the cable Slack can be removed by wrapping the cable around the tie down rail Every Arch MUST be secured END PANEL INSTALLATION Note End panels MUST be installed before installing Main Cover onto frame Step1 Remove Carriage bolts from the Top Ridge Rail and the two Upper Side Cross Rails Install End Panel Door w Zippers DZD 700...

Page 7: ...rnbuckle turn buckle should be loosened all the way and attach the turnbuckle to the hole in the foot of the end arch Hold the end of the unsecured rope and apply downward pressure with a foot to remove excess slack Re adjust gathered material evenly along inside edge of door rope slot This step is key to getting a good door fit Tie off the end off the rope to a second turnbuckle fully expanded at...

Page 8: ...not flap around in the wind but not so tight that it tears the material cover The fabric backed PE fabric of Rhino Shelter units does not stretch If you pull it so tight that the fabric is stretched a small amount of additional stress from wind or contact can cause premature tears and material failure Only tighten cover enough to remove valleys between arch assemblies Do Not over tighten Once the ...

Page 9: ...rall adjustment If necessary readjust rope tie off on turnbuckle as needed to tighten or loosen as needed Cleaning cover and doors can be cleaned with a mixture of light detergent and water A soft bristle brush with the mixture can be used to loosen any hard dirt mold or buildup on the cover After cleansing the cover should be rinsed thoroughly to avoid any chemical reaction from residual detergen...

Reviews: