background image

                                                                

Assembly Instructions

 

14X30X12 Round Utility  

 

 
V2.3 

Please Do NOT Return Assembly to Dealer or Store. For All Assemb

oducts directly 

Customer Service 800-447-70

8

ly Questions or Shortages Please Call MDM Pr

79 or 203-877-7070 

Assembly with the Main Cover colored side showing 
from the outside of the unit. 
 

Step 2.

  Loosen the 4 ratchets.  Place the hook that is 

attached to the ratchet strap into the outer hole in the 
foot of each end arch.  
 

 

 
 

Step 3.  

It is important that your cover is laying square 

over the frame before you start ratcheting down the 
cover. Once the cover is even on all four sides, slowly 
start ratcheting down all four corners. 
 

Warning: Do not over tighten the ratchet straps. 

 
Pay close attention to how tight the cover is put onto the 
frame.  It should be tight enough so it does not flap 
around in the wind, but not so tight that it tears the 
material cover.  The fabric backed PE fabric of Rhino 
Shelter units does not stretch.  If you pull it so tight that 
the fabric is stretched, a small amount of additional 
stress from wind or contact can cause premature tears 
and material failure.  Only tighten cover enough to 
remove valleys between arch assemblies.  Do Not over 
tighten. 
 

Once the ratchet starts becoming harder to tighten 
stop so you do not damage the cover.  

 

 

 

 

 
Step 4

.  When the cover is completely aligned secure 

the cover to the bottom tie-down cross rail using the rope 
provided.  Start at one end and tie off the rope to the 
cross rail.  Lace the rope through the grommets in the 
cover and back under the tie-down cross rail.  Repeat 
this on the opposite side. 
 

 

 

 

A Roll Up Door Kit is supplied as standard for one end 
door on the Utility Building.  Refer to the instructions for 
proper assembly.  This assembly will make it easy to 
open and close the tall door for entry and exit. 

Summary of Contents for PB143012RGN

Page 1: ...d be inspected upon delivery from carrier and any evident damages should be noted on the bill of lading before signing If upon opening the cartons hidden damage is noted contact carrier or its agent immediately Claims for shipping damage MUST be made with the shipping company An inspection of the goods will most likely be required Do not discard packing or any components before the freight company...

Page 2: ...47 7079 or 203 877 7070 2 Base Cross Rail Poles Side Ridge Cross Rail Poles Center Straight Uprights Mid Connect Tube Note All Side and Base Ridge Poles MUST be on Inside of Arch Frame Members Top Ridge Poles MUST be on Outside of Arch Frame members except at Ends See Frame P u a Interior Arches End Arch with Foot Top Ridge Poles Wind Brace SITE PREPARATION Select a level or as close to level as p...

Page 3: ...completely until the frame is completed and set in place Attach one end upright mid tube connect sub assembly to each end of a pair to assembled crest tubes to construct each end arch Qty 2 Attach one Center Upright Mid Connect Tube sub assembly to each side of the remaining Crest Tube pairs to construct the interior arches Qty 5 Step 2 Assemble each of four 4 Corner Wind Braces from section A B w...

Page 4: ...hten bolts that connect the Cross Rails to the End Arches They must be removed for proper for End Panel Zippered Door installation For each arch that is added add a side cross rail and the top ridge rail by inserting a swedged end cross rail SCR 5030 into the prior pole end By adding cross rails at base side and top ridge the arches will integrate into a strong frame assembly For the other End Arc...

Page 5: ...bers to Cross Rails along base side and top Do not over tighten or oval tubing After hardware is tightened insert plastic end plugs 14 2 3 8 15 1 1 8 into all open ends of frame members NOTE Frame must be anchored before installing any doors or cover Each Rhino Shelter 14x30x12 building comes with 14 EARTH CABLE ANCHORS with U bolts and nuts These versatile anchors allow the frame to be secured to...

Page 6: ... tighten Do not attach to base cross rails Ensure there is no slack in the cable Slack can be removed by wrapping the cable around the tie down rail Every Arch MUST be secured END PANEL INSTALLATION Note End panels MUST be installed before installing Main Cover onto frame Step1 Remove Carriage bolts from the Top Ridge Rail and the two Upper Side Cross Rails Install End Panel Door w Zippers DZD 700...

Page 7: ...rnbuckle turn buckle should be loosened all the way and attach the turnbuckle to the hole in the foot of the end arch Hold the end of the unsecured rope and apply downward pressure with a foot to remove excess slack Re adjust gathered material evenly along inside edge of door rope slot This step is key to getting a good door fit Tie off the end off the rope to a second turnbuckle fully expanded at...

Page 8: ...not flap around in the wind but not so tight that it tears the material cover The fabric backed PE fabric of Rhino Shelter units does not stretch If you pull it so tight that the fabric is stretched a small amount of additional stress from wind or contact can cause premature tears and material failure Only tighten cover enough to remove valleys between arch assemblies Do Not over tighten Once the ...

Page 9: ...rall adjustment If necessary readjust rope tie off on turnbuckle as needed to tighten or loosen as needed Cleaning cover and doors can be cleaned with a mixture of light detergent and water A soft bristle brush with the mixture can be used to loosen any hard dirt mold or buildup on the cover After cleansing the cover should be rinsed thoroughly to avoid any chemical reaction from residual detergen...

Reviews: