OPERATION
2407TL 01/11
Operation Section 4-14
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADER BOOM ASSEMBLY
•
Inspect condition of each arm section weldment
•
Ensure all pins are in place.
•
Ensure all bolts and screws are properly
installed.
•
Check condition of bushings at boom pivot
points.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
OPS-L-0005_B
HYDRAULIC LINE INSPECTION
•
Check for hydraulic leaks along hoses,
cylinders and fittings.
IMPORTANT
: DO NOT
use your hands to check for oil leaks. Use a
piece of heavy paper or cardboard to check for
hydraulic oil leaks.
•
Inspect the condition of the valve weldment.
•
Ensure fitting is properly connected
•
Inspect condition of bushings.
OPS-L-0018_B
Hydraulic Hoses
BUCKET INSPECTION
•
Ensure all pins are in place.
•
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly.
•
Inspect the condition of the bucket lug
weldments.
•
Inspect condition of bushings.
OPS-L-0007_B
Bucket Pins
Summary of Contents for 2407TL
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 32: ......
Page 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 40: ......
Page 41: ...Operation Section 4 1 OPERATION SECTION...
Page 84: ......
Page 85: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 95: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 96: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Page 97: ......
Page 100: ...2407TL SOM 01 11 P N F 4003C Printed U S A 2407TL LOADER...