OPERATION
2407TL 01/11
Operation Section 4-32
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADING LOW TRUCKS OR SPREADERS FROM A PILE
For faster loading, minimize angle of turn and
length of run between pile and spreader. Back
grade occasionally with a loaded bucket to keep
working surface free of ruts and holes. Also, hold lift
control forward so full weight of bucket is scraping
ground.
Do not roll bucket over and attempt to backgrade.
This type of use can cause severe overloading of
bucket cylinders when fully extended, possibly
causing bucket cylinder rods to become bent.
Summary of Contents for 2407TL
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 32: ......
Page 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 40: ......
Page 41: ...Operation Section 4 1 OPERATION SECTION...
Page 84: ......
Page 85: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 95: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 96: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Page 97: ......
Page 100: ...2407TL SOM 01 11 P N F 4003C Printed U S A 2407TL LOADER...