OPERATION
2407TL 01/11
Operation Section 4-41
© 2011 Alamo Group Inc.
OPERA
T
ION
10.2 Hauling the Tractor and Implement
Before transporting a loaded tractor and implement,
measure the height and width dimensions and gross
weight of the complete loaded unit. Ensure that the
load will be in compliance with the legal limits set for
the areas that will be traveled through.
OPS-U- 0024
Use adequately sized and rated trailers and
equipment to transport the tractor and implement.
Consult an authorized dealer to determine the proper
equipment required. Using adequately sized chains,
heavy duty straps, cables and/or binders, securely tie
down both the front and rear of the tractor utilizing the
proper tie down locations as specified by the tractor
manufacturer.
OPS-U- 0025
Summary of Contents for 2407TL
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 32: ......
Page 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 40: ......
Page 41: ...Operation Section 4 1 OPERATION SECTION...
Page 84: ......
Page 85: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 95: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 96: ...MAINTENANCE 2407TL 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Page 97: ......
Page 100: ...2407TL SOM 01 11 P N F 4003C Printed U S A 2407TL LOADER...