ASSEMBLY
2409TL 01/11
Assembly Section 3-12
© 2011 Alamo Group Inc.
ASSEMBL
Y
5. On level ground, tilt the attachment down 90 degrees
and lower it to the ground. Lower the loader further to
slightly raise the front of the tractor of the tractor off
the ground. Drive the tractor in reverse while the
attachment is on the ground for 20-30 feet to insure
the attachment does not disconnect. If the attach-
ment disconnects during this process, discontinue
the use of attachment and contact your dealer.
Do not use an attachment that is not securely attachment that is not
securely attached to the quick hitch. The attachment could fall resulting in
severe crushing injuries or death to the operator or bystanders.
Summary of Contents for 2409TL
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 34: ......
Page 35: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 47: ...Operation Section 4 1 OPERATION SECTION...
Page 91: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 100: ...MAINTENANCE 2409TL 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE...
Page 101: ...MAINTENANCE 2409TL 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 104: ...2409TL SOM 01 11 P N F 4203C Printed U S A 2409TL LOADER...