OPERATION
TW120 01/11
Operation Section 4-17
© 2011 Alamo Group Inc.
OPERA
T
ION
Shorten the driveline profiles as follows:
•
Remove the driveline from the tractor.
•
Position the mower (Lift and Semi-Mount Type -
Raise and lower/ Pull Type - Turn sharply) to
the point with the shortest distance between
the tractor PTO shaft and cutter gearbox. Shut
down the tractor and securely block the mower
in this position.
•
Pull driveline apart and reattach yoke to PTO
shaft.
•
Hold driveline sections parallel to one another
and measure back 1” from yoke of each shaft
and place mark on opposite section. Cut this
length off with a saw.
•
Round off all sharp edges and debur.
•
Thoroughly grease then reinstall the driveline.
•
Recheck for proper operation.
Engagement Check Procedure
•
With the driveline attached, position the mower to the point where the telescoping driveline is at its
maximum extension. Completely shut down the tractor and secure in position.
•
Mark the inner driveline shield 1/8” from the end of the outer shield.
•
Disconnect the driveline from the tractor and separate the two driveline halves.
•
Measure the distance from the mark to the end of the inner profile. This length is the amount the driveline
profiles were engaged.
•
If the engaged length is less than 12” for a CV driveline and less than 6” for a non-CV driveline, the shaft is
considered too short and should be replaced with a longer shaft. Consult an authorized dealer to
purchase the required driveline length.
NOTE:
When raising the mower, at least 1” clearance must be maintained between the driveline and the
mower deck. If necessary, place an upper lift stop on the 3-point hitch control lever to limit the height the
mower can be raised.
OPS-R-0005-G
Summary of Contents for TW120
Page 9: ...Safety Section 1 1 2011 Alamo Group Inc SAFETY SECTION...
Page 28: ...SAFETY TW120 01 11 Safety Section 1 20 2011 Alamo Group Inc SAFETY Decal Description...
Page 29: ...SAFETY TW120 01 11 Safety Section 1 21 2011 Alamo Group Inc SAFETY...
Page 30: ...SAFETY TW120 01 11 Safety Section 1 22 2011 Alamo Group Inc SAFETY...
Page 31: ...SAFETY TW120 01 11 Safety Section 1 23 2011 Alamo Group Inc SAFETY...
Page 32: ...SAFETY TW120 01 11 Safety Section 1 24 2011 Alamo Group Inc SAFETY...
Page 33: ...SAFETY TW120 01 11 Safety Section 1 25 2011 Alamo Group Inc SAFETY...
Page 34: ...SAFETY TW120 01 11 Safety Section 1 26 2011 Alamo Group Inc SAFETY...
Page 35: ...SAFETY TW120 01 11 Safety Section 1 27 2011 Alamo Group Inc SAFETY...
Page 36: ...SAFETY TW120 01 11 Safety Section 1 28 2011 Alamo Group Inc SAFETY...
Page 38: ......
Page 39: ......
Page 65: ......
Page 91: ...Introduction Section 2 1 2011 Alamo Group Inc INTRODUCTION SECTION...
Page 96: ......
Page 97: ...Assembly Section 3 1 2011 Alamo Group Inc ASSEMBLY SECTION...
Page 109: ...Operation Section 4 1 2011 Alamo Group Inc OPERATION SECTION...
Page 156: ......
Page 157: ...Maintenance Section 5 1 2011 Alamo Group MAINTENANCE SECTION...
Page 160: ...MAINTENANCE TW120 01 11 Maintenance Section 5 4 2011 Alamo Group MAINTENANCE...
Page 161: ...MAINTENANCE TW120 01 11 Maintenance Section 5 5 2011 Alamo Group MAINTENANCE...
Page 174: ...MAINTENANCE TW120 01 11 Maintenance Section 5 18 2011 Alamo Group MAINTENANCE...
Page 188: ...Secci n de Seguridad 1 1 2011 Alamo Group Inc SECCI N DE SEGURIDAD...
Page 189: ......