Install Conduit, Cabling, and J-Boxes
15
8.0
Install Conduit, Cabling, and J-Boxes
Load cells are supplied with 60' cables. Since each cell is temperature-compensated for the supplied cable length,
do not change any cable length. There will be room to coil excess cable inside the junction box after making final
connections.
All cabling must be enclosed in 3/4" weatherproof conduit from the load cell to the junction box in accordance with
applicable electrical codes. NEMA 4 junction boxes are supplied from the factory with 30" sections of flexible
conduit and waterproof conduit adapters where necessary to maintain NEMA 4 integrity.
Figure 8-1. J-Box Wiring and conduit Runs for a Four Section/Three Module Scale
Load Cell
Cable to
Connector
Pocket 1 Conduit
Pocket 8 Conduit
Pockets 1, 2, 3, 4
Conduit runs to J-Box
Pocket 5 Conduit
Module A
Module B
Pocket 3 Conduit
1
8
2
7
SI - Green
SI - White
EX - Red
EX - Black
SHD - Shield
+
-
+
-
+SI
-SI
+EX
-EX
SHD
+SI
-SI
+EX
-EX
SHD
+SI
-SI
+EX
-EX
SHD
+SI
-SI
+EX
-EX
SHD
J3
J4
J7
J8
J6
J5
J2
J1
+SI
-SI
+EX
-EX
SHD
+SI
-SI
+EX
-EX
SHD
+SI
-SI
+EX
-EX
SHD
+SI
-SI
+EX
-EX
SHD
Load Cell #1
Load Cell #3
Load Cell #8
Load Cell #6
Load Cell #2
Load Cell #4
Load Cell #7
Load Cell #5
+SI
-SI
+EX
-EX
SHD
-SEN
+SEN
SHD - Shield
+SI
-SI
+EX
-EX
SHD
-SEN
+SEN
Indicator/J10
Expansion/J9
Cable to Indicator
SI - Green
+
SI - White
-
EX - Red
+
EX - Black
-
SEN - Yellow
-
SEN - Blue
+
Pocket 4 Conduit
Pocket 6 Conduit
6
3
Pocket 4 Conduit
Pocket 5 Conduit
5
4
Module C
Summary of Contents for Survivor SR
Page 1: ...SURVIVOR SR Siderail Truck Scale Assembly Instructions 45698 Rev D...
Page 2: ......
Page 29: ......