Beluga-C1/C1.5 Training
241
Slide 241
PM
A PM visit is required every 10 km
SP Modes
7803: Current PM counter status
7804: Resets the PM counter
» Do this after PM
PM
Service manual, Appendix: Maintenance Tables
Draw the attention of the class to the maintenance table.
The PM cycle is 10 km of printouts.
¾
Not all items need PM at 10 km. Some only need PM at 20, 30, 40 km, and
so on. See the PM table for details.
PM Items
You might wish to have the trainees do a maintenance procedure on their
machines.
¾
Development filter: Replace at 10 k. If this is blocked, air pressure may
increase inside the development unit, and this may lead to toner scattering.
Lubrication
Note the diagrams in the manual indicating the lubrication points for the
development and fusing units.
Counter Reset
Reset the PM counter after doing PM (SP 7804).
¾
The slide shows the SP modes related to PM.
Summary of Contents for Beluga-C1
Page 110: ...Beluga C1 C1 5 Training 110 Slide 110 INSTALLATION Updating Firmware No additional notes ...
Page 236: ...Beluga C1 C1 5 Training 236 Slide 236 Exit Guide Open here to remove jams No additional notes ...
Page 253: ...Beluga C1 C1 5 Training 253 Slide 253 End of Course No additional notes ...