Electrical Components
• Before you replace the EGB (Engine Board), the controller, or the NVRAM, print out the SMC reports
(“SP Mode Data” and “Logging Data”).
• After you replace the EGB (Engine Board) or the controller, remove the NVRAM from the old board
and install it on the new board. If the NVRAM on the old board is defective, replace the NVRAM
(
*
NVRAM Replacement procedure).
Electrical board unit
1. Front door
2. Top cover
3. Right cover [A] (
x 1)
Electrical Components
41
3
Summary of Contents for G-P3
Page 1: ...Model G P3 Machine Code G190 SERVICE MANUAL January 2008 Subject to change...
Page 11: ...10...
Page 77: ...11 Harness guide C x 2 12 Drive unit D x 6 x 16 3 Replacement and Adjustment 76 3...
Page 91: ...3 Replacement and Adjustment 90 3...
Page 137: ...LEDs No LEDs are used for this model except for the Network Interface 4 Troubleshooting 136 4...
Page 337: ...5 Service Tables 336 5...
Page 411: ...MEMO 410...
Page 412: ...MEMO 411...
Page 413: ...MEMO 412...