GlobalScan
TM
Ver. 2.0
Administrator’s Guide
36
Projects
Tab
>
Add a New Project
A.
Column Headings:
•
Project Name
Ç
– After a project has been created, it is listed under this
column. Sort the list is ascending/descending order by clicking the up/down
arrow. Each project name corresponds to a button on the MFD touch screen,
e.g., Project 1, Project 2, etc. (max. 25 characters), as shown below. Though
project names can be the same, it is not practical or recommended.
•
Project ID
– The Project ID is system-assigned, thus is a read-only field that
cannot be changed.
Note
: Clicking on the Project Name or Project ID will open the Project Configuration screen
(see B. Add a New Project, to follow).
•
Display Order
– This numeric value identifies the order in which the Project
buttons are to appear on the MFD’s touch screen. For instance, the Service
users access most often would be assigned a Display Order of 1 for instance,
thus that Project button would appear on the far left-hand side of the MFD’s
touch screen, as the “Project 1” button in the illustration shown above.
Note
: The numeric value of multiple Services can be repeated, e.g., they can all be “1.” In this
case, the actual display priority will be random.
•
Delete
– Click the
button to delete the adjacent project, permanently
removing the project and related settings from the GlobalScan Server.
Note
: If all projects are deleted, the MFDs will return an error that no projects are defined for
the profile.
Project buttons
(max. 6 per screen).
Scroll up/down to view/select
a Project button