PAGE: 9/58
Model:
Taurus-C1 / P1
Date:
21-Oct-11
No.:
RD074026
<Main Machine \ Installation Flow >
Installation Flow was revised accordingly with the adoption of the pre-installed developer.
Procedure
Installation: Power Off
Unpack
Install Attention Light
Install Operation Panel
Connect ARDF (D074/D075)
Attach Fusing Roller Knob Holder
Level the Main Machine
Test Breaker Switch
Install Toner Bottles
Installation: Power On
Connect Main Machine to Power Source and Power On
Start Toner Fill
SP3051-001 (Manual Toner Fill)
Initialize Process Control
SP3020-001 (Process Setup)
SP3012-001 to check whether initialization was successful
Exit SP Mode and Power Off
Fiery Controller Connection
Fiery Controller Setup
Paper Library Data Installation
Finishing the Installation