T
echnical
B
ulletin
PAGE: 1/6
Model:
Taurus-C1a/C1b/P1 (D074/D075/M044)
Date:
13-Jun-12
No.:
RD074074
Subject: Modification Program for
Temp Yield Change of
the Drum Cleaning Unit
(RD074023a)
Prepared by: T. Komori
From:
1st Tech Service Sect., PP Tech Service Dept.
Classification:
Troubleshooting
Mechanical
Paper path
Product Safety
Part information
Electrical
Transmit/receive
Other ( )
Action required
Service manual revision
Retrofit information
Tier 2
This RTB explains the modification program for “
Temporary Yield Change of the Drum
Cleaning Unit
” announced in RD074023a.
Problem Overview (RD074023)
Symptom
Short Interval
Banding
(also called 'high-pitch' banding)
Cause PDCU Vibration
Temp Action Replace the component parts (brush roller, lubricant bar and joint) at half
of their yield, which is 67,500m and equivalent to 150kP.
Design Modification
The modified drum cleaning units are installed with anti-vibration parts, which have been
implemented in the mass production from February 2012.
Rework the non-modified drum cleaning units in the field – currently in operation and
TCRU Set A – by ordering FOC modification kit D0749904 which includes the following 3
parts.
D0749904 DRUM CLEANING UNIT:MODIFICATION
D0742477 SHEET:STAY:APPLY
x 8 pcs
D0742437 SHEET:FRAME:APPLY
x 4 pcs
D0742510 CUSHION:CLEANING UNIT:ASS'Y
x 8 pcs
NOTE
1) D0749904 includes parts for 4 stations.
Place 1 order of D0749904 per 1 mainframe or per 1 TCRU Set A.
2) The above 3 parts can also be procured separately as service parts.