7
ASSEMBLY
Carry Handle
Powerhead
Assembly
#10 x 3/4"
(19 mm) Pan
Head Screws (2)
Extended
Flange
#10 x 3/4"
(19 mm)
Pan Head
Screws (2)
Hose Clips
(1 on each side)
Powerhead
Assembly
Carry Handle Assembly
1. Locate the Carry Handle and the two
(2) #10 x 3/4” (19 mm) Pan Head
Screws in loose parts bag.
2. Position the Carry Handle on top of the
Powerhead Assembly, with the Carry
Handle Extended Flange to the rear of
the Powerhead Assembly, as shown.
3. Insert a #10 x 3/4” (19 mm) Pan Head
Screw through the hole at each end of
the Carry Handle and into the Powerhead
Assembly. Tighten securely.
Hose Storage Clip Assembly
1. Locate the two (2) Hose Clips and
four (4) #10 x 3/4” (19 mm) Pan Head
Screws in the loose parts.
2. Place a Clip into the recess next to one
of the Latches. The Curve of the Clip
should face outward.
3. Insert a #10 x 3/4” (19 mm) Pan Head
Screw into each mounting hole and
tighten securely.
4. Repeat on the other side.
SP7054 RT12000.indb 7
9/5/18 12:04 PM