background image

- 5 - 

PRESENTATION

 

MultiCOM 411 is a complete PROFIBUS-DP slave according to IEC 61158. It allows to integrate the management and monitoring of 
the UPS into a PROFIBUS network. Baud rates from 9.6 kbit/s up to 12 Mbit/s are supported and automatically detected. 
 
 

I

N THE BOX

 

 

 
 

MultiCOM 302 board 

 

 

 
 

PROFIBUS DP Gateway 

 

 

 
 

Connection cable between MultiCOM 302 

and PROFIBUS DP Gateway 

 
 
 

E

XTERNAL VIEW

 

 

PROFIBUS Connector 

 

Configuration Switches 

 

Status LEDs 

 

Reserved 

 

MultiCOM 302 Connector 

 

Power Connector 

 

DIN-rail Connector 

 

 

Summary of Contents for MULTICOM 411

Page 1: ......

Page 2: ......

Page 3: ...re The device must be used exclusively for the purpose for which it was designed Any other use is to be considered improper and as such dangerous The manufacturer declines all responsibility for damage caused by improper wrong and unreasonable use ENVIRONMENTAL PROTECTION Our company devotes abundant resources to analysing environmental aspects in the development of its products All our products p...

Page 4: ...ORS AND LEDS 6 PROFIBUS CONNECTOR 6 POWER CONNECTOR 6 MULTICOM 302 CONNECTOR 6 STATUS LEDS 6 MULTICOM 302 JUMPER AND DIP SWITCHES SETTINGS 7 INSTALLATION 7 PROFIBUS CONFIGURATION SWITCHES 8 CONNECTION CABLE MULTICOM 302 PROFIBUS DP GATEWAY 8 DIN RAIL MOUNTING 8 PROFIBUS I O DATA 9 ...

Page 5: ...to a PROFIBUS network Baud rates from 9 6 kbit s up to 12 Mbit s are supported and automatically detected IN THE BOX MultiCOM 302 board PROFIBUS DP Gateway Connection cable between MultiCOM 302 and PROFIBUS DP Gateway EXTERNAL VIEW PROFIBUS Connector Configuration Switches Status LEDs Reserved MultiCOM 302 Connector Power Connector DIN rail Connector ...

Page 6: ...quired 2 GND Note no power supply is provided with the device MULTICOM 302 CONNECTOR PIN Description 5 1 9 6 female 1 2 3 4 6 7 5 Signal Ground 8 RS485 9 RS485 STATUS LEDS State Status 1 PROFIBUS Online Off Not online Green Online 2 PROFIBUS Offline Off Not offline Red Offline 3 Not used 4 PROFIBUS Diagnostic Off No diagnostics present Red flashing 1Hz Error in configuration Red flashing 2Hz Error...

Page 7: ... previously removed 4 Connect the PROFIBUS DP Gateway to the MultiCOM 302 using the cable provided with the device NOTE if necessary you can also use another cable realized in accordance with the specifications see Connection cable MultiCOM 302 PROFIBUS DP Gateway 5 Set the PROFIBUS node ID see Configuration Switches 6 Connect the PROFIBUS DP Gateway to the PROFIBUS DP Network 7 Connect the power ...

Page 8: ...and configuring the switches avoid touching the circuit boards and components Example If the node address should be 42 set switch A to 2 and switch B to 4 CONNECTION CABLE MULTICOM 302 PROFIBUS DP GATEWAY DB9 male PIN connect to RJ 45 PIN 5 2 9 3 8 4 NOTE Use a twisted pair to connect PIN 9 and 8 of DB9 to PIN 3 and 4 of RJ 45 DIN RAIL MOUNTING To snap the gateway on first press it downwards 1 to ...

Page 9: ...5 36 Output current phase L2 A 10 19 37 38 Output current phase L3 A 10 20 39 40 Output peak current phase L1 A 10 21 41 42 Output peak current phase L1 A 10 22 43 44 Output peak current phase L1 A 10 23 45 46 Battery current of positive bench A 10 24 47 48 Battery current of negative bench A 10 25 49 50 Battery voltage of positive bench V 10 26 51 52 Battery voltage of negative bench V 10 27 53 5...

Page 10: ... 58 115 116 Echo of shutdown delay time Seconds 59 117 118 Echo of restore delay time Minutes 60 119 120 Command result 0x0F00 Ready to receive command 0x0100 Command Code Command code is wrong 0x0200 Command Code Command is not handled 0x0300 Command Code Parameter out of range Reg 116 0x0E00 Command Code Command sent to the UPS Integer 61 121 122 RESERVED 62 123 124 RESERVED 63 125 126 RESERVED ...

Page 11: ... the device is ready to accept it by verifying that Command Result 0x0F00 INPUT DATA register 60 NOTE 3 write in register 2 and 3 Shutdown delay time and Restore delay time before writing in register 1 for executing a system shutdown or a system shutdown restore otherwise writing in register 2 and 3 will have no effect Example of Power OFF the UPS in 3 minutes and Power ON after 8 hours System Shu...

Page 12: ...uration to have accesso to UPS state and commands Example of master configuration to have accesso to all UPS measurements and commands Example of master configuration to have access to the UPS input data register from n 1 to n 16 ...

Page 13: ......

Page 14: ...0MNACCMC8ENUB ...

Reviews: