65
U
SE
8-10kVA single phase version
1.
Use 3 cables with 10 mm
2
section (EARTH, N and
L) in input, and 3 cables with 10 mm
2
section for the
output (EARTH, N and L).
With reference to the
figure shown at the side:
- Insert the cables from the 63A magneto-thermal
switch into seal stop P2 (input line).
- Insert the cables from the load into seal stop P1
(output line).
- Strip the cables observing the measurements
provided.
- Insert the part that has just been stripped into the
ferrules provided.
2.
Connect the wires to the relative terminals
strictly following the instructions set out
below:
Input line
a - Ensure that the magneto-thermal switch
upstream is open.
b - Connect the earth wire to terminal 3.
c - Connect the neutral wire to terminal 1.
d - Connect the phase wire to terminal 2.
Output line
a - Connect the earth wire to terminal 6.
b - Connect the neutral wire to terminal 7.
c - Connect the phase wire to terminal 8.
Bypass line
a - Ensure that a jumper is connected at
terminals 9 and 10; this is needed for the
correct operation of the UPS.
3.
Secure the cable guides to the flange, close the drawer and secure it with the screw removed previously.
Summary of Contents for SENTINEL DUAL SDL 10000
Page 1: ......
Page 2: ......
Page 4: ...4 ...
Page 14: ...14 ...
Page 15: ...15 I MANUALE D USO I ...
Page 50: ...50 ...
Page 51: ...51 GB USER MANUAL GB ...
Page 86: ...86 ...
Page 87: ...87 D BEDIENUNGSANLEITUNG D ...
Page 122: ...122 ...
Page 123: ...123 F MANUEL DE L UTILISATEUR F ...
Page 158: ...158 ...
Page 159: ...159 E MANUAL DE USO E ...
Page 194: ......
Page 195: ......
Page 196: ...0MNSDL6K5RU5LUC ...