TECHNICAL ASSISTANCE SERVICE
46
Once you have completed all the checks listed above,
proceed as follows to start up the boiler for the first time.
- Switch the electricity supply ON at the system’s main
switch and at the control panel.
Check that the display comes on.
- When the boiler is first powered on, it performs a num-
ber of self-tests. These may take a few minutes. When
the tests are completed, the display reads out boiler
temperature.
Perform the following operations on the boiler control
panel.
- Press the "
OK
" button.
Select "
Operator unit
" and press "
OK
".
Select "
Language
" and press "
OK
".
Set the language you want.
SEE THE “INSTALLER PARAMETERS" MANUAL TO
ACCESS THE HEATING ENGINEER (INSTALLER) FUN-
CTIONING LEVEL.
ON
OFF
Boiler temperature
Time of day and date
Operator unit
Commissioning
Heating
Only for "20"-"28" models with a remote storage
cylinder (optional)
- If a storage cylinder with temperature sensor is con-
nected, install the "Storage cylinder sensor kit" code
4031847 and connect this to terminals "M-B3".
SEE THE “INSTALLER PARAMETERS" MANUAL FOR
INFORMATION ON CONFIGURATION.
L1
S3
EX1 S3 T2 T1 N
L1
QX3
N
SK2 SK1
N
N
Y2
QX2
Y1
QX4
Q2
QX5
FX1
QX1
QX1
N
L
P
Q
R
S
T
B
M
M
H1
B9
B3
M
M
M
M BX2
BX1
B1
BX3
M
M
B2
BX5
H3 GX1 M
G+ CL- CL+ MB DB
X60
P1
n
n
p
n
k
h
f
n
n
b
a
X30
X50
LPB
BSB
Main board
REMOTE STORAGE CYLINDER SENSOR
Initial start-up
INITIAL START-UP