Installation
21
20094575
GB
4.9
Gas supply
4.9.1
Gas train
The gas train is type-approved according to standard UL 795
and is supplied separately from the burner.
The gas train can enter the burner from the right or left side,
depending on which is the most convenient.
The gas train must be connected to the gas attachment 1)
(Fig. 19) with the flange 2), the gasket 3) and the screws 4)
supplied with the burner.
The gas solenoids must be as close as possible to the burner,
to ensure that the gas reaches the combustion head within the
safety time of 3s.
Ensure that the maximum pressure necessary for the burner is
included in the calibration field of the pressure regulator (col-
our of the spring).
4.9.2
Gas feeding line
It must be type-approved according to required standards and is
supplied separately from the burner.
Key (Fig. 20)
1
Gas input pipe
2
Manual valve
3
Pressure regulator
4
Minimum gas pressure switch
5
1st safety shut off valve
6
2nd safety shut off valve
7
Standard issue burner with flange gasket
8
Gas adjustment butterfly valve (*)
9
Burner
10 Maximum gas pressure switch (*)
(*) On the burner
WARNING
See the accompanying instructions for the ad-
justment of the gas train.
D722
Fig. 19
Fig. 20
D2438
GAS PILOT LINE
MAIN GAS LINE
Summary of Contents for C9327710
Page 2: ...Original instructions ...
Page 43: ......