‐
26
‐
I
NSERTION
/
EXTRACTION PROCEDURE
The following operations must only be performed by skilled and specifically trained service personel.
When the PM is not inserted, uncovered parts with dangerous voltage are present on the corresponding
backplane.
The PM, due to its weight, must be handled by at least two persons.
Strictly comply with the instructions as listed below.
INSERTION
1.
Note: the PM must be inserted in the slot of a previously
removed one or, in case of first installation, in the first
free dedicated slot of the cabinet starting from the base.
If present, remove the protection cover and store it together
with the fastening screws.
2. Check that the Switch Lock is in open position
(see picture on the right).
3. Carefully insert the PM into the cabinet
(requires two people) and fasten it using the
supplied screws, as shown in the picture.
4. Turn the Switch Lock 90 Degrees clockwise to the close position
(See picture on the right).
5. Switch on the PM using the display (ref. to “Operative procedures” chapter).
Summary of Contents for multipower BTC 170
Page 1: ......
Page 2: ......
Page 6: ...6...
Page 8: ...8 GENERAL VIEWS Front view Back view Frame Handle with lock Door Back Panel...
Page 20: ...20 The wiring diagram of the Modular UPS Power Cabinet is provided below...
Page 23: ...23 The wiring diagram of the Modular UPS Combo Cabinet is provided below...
Page 54: ...54 Combo Cabinet...
Page 55: ...55 Battery Cabinet...
Page 82: ......
Page 83: ......
Page 84: ...0MNMPWK25R1ENUA...