20170392
16
GB
Installation
6.1
Notes on safety for the installation
After carefully cleaning all around the area where the burner is to
be installed, and arranging for the environment to be illuminated
correctly, proceed with the installation operations.
6.2
Handling
The burner packaging includes a wooden platform, it is therefore
possible to handle the burner (still packaged) with a pallet truck
or fork lift truck.
6.3
Preliminary checks
Checking the consignment
Check the identification label of the burner, showing:
the model (see
A
in Fig. 8) and the type of burner (
B
);
the year of manufacture, in cryptographic form (
C
);
the serial number (
D
);
the absorbed electrical power (
E
);
the types of fuel used and the relative supply pressures (
F
);
the minimum and maximum possible output data of the
burner (
G
) (see Firing rate).
6
Installation
DANGER
All the installation, maintenance and disassembly
operations must be carried out with the electricity
supply disconnected.
ATTENTION
The installation of the burner must be carried out
by qualified personnel, as indicated in this manual
and in compliance with the standards and
regulations of the laws in force.
DANGER
The combustion air inside the boiler must be free
from hazardous mixes (e.g.: chloride, fluoride,
halogen); if present, it is highly recommended to
carry out cleaning and maintenance more
frequently.
ATTENTION
Burner handling operations can be highly
dangerous if not carried out with the greatest
attention: distance unauthorised personnel, check
integrity and suitability of the means available.
Check also that the area in which you are working
is empty and that there is an adequate escape
area (i.e. a free, safe area to which you can
quickly move if the burner should fall).
During handling, keep the load at no more than
20-25 cm from the ground.
After positioning the burner near the installation
point, correctly dispose of all residual packaging,
separating the various types of material.
CAUTION
Before proceeding with the installation operations,
carefully clean all around the area where the
burner will be installed.
CAUTION
After removing all the packaging, check the
integrity of the contents. In the event of doubt, do
not use the burner; contact the supplier.
The packaging elements (wooden cage or
cardboard box, nails, clips, plastic bags, etc.)
must not be abandoned as they are potential
sources of danger and pollution; they should be
collected and disposed of in the appropriate
places.
ATTENTION
A burner label that has been tampered with,
removed or is missing, along with anything else
that prevents the definite identification of the
burner makes any installation or maintenance
work difficult.
Fig. 8
D2582
A - B
C
D
E
F
G
Summary of Contents for PRESS 140 P/N
Page 2: ...Translation of the original instructions...
Page 57: ...55 20170392 GB Appendix Electrical panel layout 0 1 2 2 2 0 DIRECT START UP...
Page 58: ...20170392 56 GB Appendix Electrical panel layout 0 1 1 1 STAR TRIANGLE START UP...
Page 59: ...57 20170392 GB Appendix Electrical panel layout 0 1 0...