20168262
14
GB
Technical description of the burner
4.13
Operation sequence of the burner (GAS operation)
Key to layout (Fig. 7)
Tab. G
Key to layout (Fig. 7)
FGR
FGR enabling
X01
Gas valve 1
X02
Gas valve 2
X03
Pilot valve
X04
Ignition transformer
X05
Gas pressure > min.
X06
Gas safety circuit
X07
Boiler safety circuit
X08
Air pressure switch
X10
Burner on
X20+X21 Flame signal
X24
Lockout
X25
Fan on
X32
Air servomotor
X33
Fuel servomotor
X34
FGR servomotor
Fig. 7
X07
X06
X10
X05
X08
X20+X21
FGR
X32
X33
X34
X04
X03
X01
X02
X25
X24
S9612
Any position
t1
Safety circuits enabling standby time
(boiler and fuel)
t2
Gas valve opening time (with valve leak
detection control device active)
2.4 s
t3
Servomotor opening time
30/60 s
t4
FGR servomotor activation time
0 - t5
t5
Pre-purging time
adjustable
t6
Pre-ignition time
adjustable
t7
Flame ignition safety time
3s
t8
Flame stabilisation time
adjustable
t9’
2nd stage safety time
3s
t10
Modulation phase
t11
Adjustment time
t12
Gas valve opening time (with valve leak
detection control device active)
3s
t13
Post-purging time
adjustable
t15
post-combustion time
adjustable
t16
Flame switching off control time
5 s
t17
Gas valve control time (with valve leak
detection control device active)
30s
Summary of Contents for RLS 120/E FGR
Page 2: ...Translation of the original instructions ...
Page 51: ...49 20168262 GB Appendix Electrical panel layout 01 2 3 4506 7 891 01 ...
Page 52: ...20168262 50 GB Appendix Electrical panel layout 0 1 2 2 2 0 ...
Page 54: ...20168262 52 GB Appendix Electrical panel layout 0 0 0 12 3456 7 12 3456 7 ...
Page 57: ...55 20168262 GB Appendix Electrical panel layout 0 0 1 2 3 4 5 667 8 667 2 9 63 8 63 63 3 5 ...