20168262
20
GB
Installation
5.7
Securing the burner to the boiler
Separate the combustion head from the rest of the burner, as in
Fig. 17; proceed as follows:
loosen the 4 screws 3) and remove the cover 1);
remove the screws 2) from the two guides 5);
disconnect the socket from the maximum gas pressure
switch;
disconnect the pilot tube 6) and the hoses 7);
remove the two screws 4);
pull back the burner on the guides 5) by about 100 mm;
disconnect the electrode leads, then unthread the burner
completely from the guides;
fix the flange 9) to the boiler plate, interposing the insulating
gasket 8) supplied;
use the 4 screws supplied, with a tightening torque of 35 - 40
Nm, after protecting their thread with anti-seize products.
Provide an adequate lifting system of the burner.
WARNING
WARNING
The seal between burner and boiler must be air-
tight; after the start-up, check there is no leakage
of flue gases into the external environment.
100
mm
5
9
12
11
8
3
4
2
1
L
10
13
13
3
Fig. 17
20113660
Summary of Contents for RLS 120/E FGR
Page 2: ...Translation of the original instructions ...
Page 51: ...49 20168262 GB Appendix Electrical panel layout 01 2 3 4506 7 891 01 ...
Page 52: ...20168262 50 GB Appendix Electrical panel layout 0 1 2 2 2 0 ...
Page 54: ...20168262 52 GB Appendix Electrical panel layout 0 0 0 12 3456 7 12 3456 7 ...
Page 57: ...55 20168262 GB Appendix Electrical panel layout 0 0 1 2 3 4 5 667 8 667 2 9 63 8 63 63 3 5 ...