20145860
26
GB
Start-up, calibration and operation of the burner
6.6.3
Intermediate outputs
After adjusting the maximum and minimum output of the burner,
carry out air and gas adjustment on other intermediate positions
of the servomotor.
The passage from one position to the next one is obtained by
pressing the selector 2)(Fig. 27) on the symbol
+
or
-
.
For better adjustment repeatability, take care to stop the rotation
of the cam unit when the upper bearing that slides on the profile
4)(Fig. 29) is aligned with one of the adjustment screws 2).
Screw or unscrew the preset screw 2) to increase or decrease the
air output so as to adjust it to the corresponding gas output.
6.7
Combustion air adjustment
The air/fuel synchronisation is carried out by means of a servo-
motor 1)(Fig. 30) that, connected to a variable profile cam 2), op-
erates on the delivery air dampers and, through proper leverage,
on the combustion head and on the gas butterfly valve.
It is advisable, to reduce the loss and for a wide calibration field,
to adjust the servomotor to the maximum of the output used, the
nearest possible to the maximum opening (130°).
On the gas butterfly valve, fuel step according to the burner out-
put required, with servomotor completely open, is carried out by
the pressure stabilizer placed on the train.
The values in the Tab. K can be useful as reference for a good
fuel calibration.
Tab. K
6.8
Air / fuel adjustment
During the calibration of the air / fuel ratio the following adjust-
ments must be performed:
Air cam:
turn the adjustment screws 2)(Fig. 29) after having loosened
the screws 3).
Gas cam:
turn the adjustment screws 2)(Fig. 29) after having loosened
the screws 3).
CAUTION
After output adjustment (maximum, minimum and
intermediate), it is important to lock all the air ad-
justment screws 2) by the locking screws 3) so as
to avoid possible movements from the position of
air - gas calibration.
WARNING!
MOVING PARTS
WARNING!
DANGER: CRUSHING OF LIMBS
EN 676
Air excess
CO
Max. output
1.2
Max. output
1.3
GAS
Theoretical max.
CO
2
0 % O
2
CO
2
% Calibration
mg/kWh
= 1.2
= 1.3
G 20
11.7
9.7
9
1000
G 25
11.5
9.5
8.8
1000
G 30
14.0
11.6
10.7
1000
G 31
13.7
11.4
10.5
1000
Fig. 30
20062515
Summary of Contents for RS 1000/M BLU
Page 2: ...Translation of the original instructions ...
Page 45: ...43 20145860 GB Appendix Electrical panel layout ...
Page 46: ...20145860 44 GB Appendix Electrical panel layout 0 0 1 0 0 0 0 0 2 2 2 0 0 0 ...
Page 47: ...45 20145860 GB Appendix Electrical panel layout 0 1 2 2 2 0 ...
Page 52: ...20145860 50 GB Appendix Electrical panel layout 0 12 3 4 5 4 5 6 7 8 9 8 9 0 0 0 0 ...