WORKING
FIRING OUTPUT
The firing must occur at reducer output and not
higher than 120 kW.
In order to measure the firing output:
– Disconnect the connector (
CN1
) on the ionization
probe cable (see electrical wiring at page 7); the
burner will fire and then go into lock-out after the
safety time (3s) has elapsed.
– Perform 10 firings with consecutive lock-outs.
– On the meter read the total quantity of gas
burned. This quantity must be equal to or lower
than the quantity here given:
0.10 Nm
3
for G20 (natural gas H)
0.10 Nm
3
for G25 (natural gas L)
0.03 Nm
3
for G31 (LPG).
4.1
COMBUSTION ADJUSTMENT,
(see fig. 8)
In conformity with Efficiency Directive 92/42/EEC the
application of the burner on the boiler, adjustment and
testing must be carried out observing the instruction
manual of the boiler, including verification of the CO
and CO
2
concentration in the flue gases, their tem-
peratures and the average temperature of the water
in the boiler.
To suit the required appliance output, choose the
proper setting of the combustion head, and the air
damper opening.
The burner leaves the factory set for the mini-
mum output.
4.2
COMBUSTION HEAD SETTING
It depends on the output of the burner and is car-
ried out by rotating clockwise or counterclockwise
the setting screw (6) until the set-point marked on
the regulating rod (2) is level with the outside
plane of the head assembly (1).
In the sketch of fig. 8 the combustion head is set for
an output of 230 kW.
The set point
4
marked of the regulating rod is at the
same level with the outside plane of the head-
assembly as indicated in the diagram.
Example:
The burner is installed in a 210 kW boiler.
The burner will have to deliver about 230 kW, con-
sidering an efficiency of 90%.
The diagram indicates, that for this efficiency the
adjustment has to be effected on the set-point 4.
NOTE
The diagram is orientative; to assure a good work-
ing of the burner, we suggest to adjust the com-
bustion head according to the boiler.
D10160
210,000
150,000
290,000
190,000
170,000
130,000
kcal/h
kW
0
8
2
4
6
Set point
150
190
210
250
270
290
310
330
170
230
350
10
D6235
230,000
250,000
270,000
Fig. 8