5.9
Gas valve adjustment
The adjustment of the gas flow rate is carried out using the two
screws V1 and V2.
To alter the maximum output of gas act on the screw V1.
–
To increase the output: turn the screw V1 anticlockwise (un-
screw).
–
To reduce the output: turn the screw clockwise (tighten)
–
To alter the minimum output of gas act on the screw V2 on
the gas valve.
Remove the protection screw and act on the intern screws with a
hex key.
–
To increase the output: turn the screw clockwise (tighten).
–
To reduce the output: turn the screw anticlockwise (unscrew).
NOTE:
The connection valve-manifold allows compensat-
ing the accidental occlusion of the suction line
through the distributed gas reduction.
Fig. 13
D7453
D7452
Maximum
minimum gas on the
stabiliser (V2)
Gas feeding
Gas pressure
test point
upstream (P1)
Gas valve
Maximum
gas flow adjustment (V1)
Air/gas mixer
in the
suction line circuit
Manifold
Gas compensation
pipe
Gas train assembly
Summary of Contents for RX 150 S/PV
Page 2: ...Translation of the original instructions...
Page 48: ...20151674 46 GB Appendix Electrical panel layout 0 1 0 0 1 0 RX 150 S PV...
Page 49: ...47 20151674 GB Appendix Electrical panel layout...
Page 50: ...20151674 48 GB Appendix Electrical panel layout...
Page 51: ...49 20151674 GB Appendix Electrical panel layout 0 0 0 1 1...
Page 54: ......
Page 55: ......