-
49 -
|
Page Rigel Medical
62353+
user Manual V1.4
All Patient Connections and Applied Parts are grouped together which
eliminates the requirement to configure the Applied Parts since the
Rigel 62353 Plus will short all connections together as part of this
test. For this reason, the Applied Part configuration key is not
available.
For Class I equipment use the earth bond lead (from the black socket) and connect to a
conductive part of the enclosure. For measurements on conductive non-earthed parts,
the test needs to be repeated using the same probe.
For Class II devices use the earth bond lead (from the black socket) and connect to the
enclosure preferably encapsulated within conductive foil.
Press the green START key to begin the test. The test will run for the duration set or
until the red STOP key is pressed.
4.1.7 Equipment Leakage (Alternative)
This method is similar to the dielectric test between the mains parts shortened together
and the Applied Parts/accessible parts (conductive and non-conductive) connected
together.
This test is applicable to Class I and Class II B, BF and CF equipment. This is an IEC
62353 test. For a complete description of this test and applicable pass / fail limits,
please see Appendix B.
Press the
button (F1) to obtain the schematic representation of this test: