Performing a Quality Control Test
51
50
Performing a Quality Control Test
Performing test with control solution
1. Please run check key test first. After see " " symbol and " " appear on
the screen. Remove check key from meter. The screen shows the " "
symbol blinking and " " appears. Then you need to put a new strip into the
meter.
Re-cap
4. The test strip symbol stops blinking. You will see blinking " " symbol and
" " symbol on the screen. Then you need to approach your control solution to
the meter.
2. Remove test strip from vial and
the vial cap immediately.
3. Insert the test strip with view window, facing up, into test strip port. The code
number will appear.
PRECAUTION
- Before you do control solution test, you have to do check key test first.
- Before " " appears, please don't touch the control solution to the sample
entry on strip because meter is stilling in a internal test. If you do so, the
meter will show " " and " ".
5. Shake
the bottle of control solution well before opening the cap. Then open the
cap and put it on the table.
6. Drip a drop of control solution on the top of the cap.
7. Gently touch sample entry of the strip with the control solution on
the top of the cap.
NOTE
-
Don't drip the control solution to sample entry of strip directly.
-
Don't touch the control solution. If you have touched it, please clean up
with water.
OPEN
○
×