Adjustment of the Gas Rate
ONGAS 306/W & 307/W ( VR 425 Series Gas Valve )
The boiler must be run at full modulation rate
mode before starting the adjustment, therefore
the boiler must be set test mode by using LCD
display. Summer mode button should be
pressed and hold more than 5 second , then
(100) will be appeared on screen and boiler will
be set to full modulation rate automatically.
Meanwhile flue gas analyzer should be prepared
for measurement and its probe should be
inserted to chimney by means of flue gas
measurement hole.
Remove the plastic cover of gas valve by pulling. Use a
proper ,thin screwdriver , if necessary .(as it shown in the
picture)
Increasing or decreasing gas rate by checking emission (O
2
,
CO
2
, CO ) values from the flue gas analyzer according to
above table. Use the proper Allen tool and, rotate the Allen to
right for decrease and left for increase. Continue this process
until the reaching emission values in the table .(as it shown in
the
picture)
Rotate tool to right and left to increase and
decrease CO
2
. Continue this process until the
reaching emission values in the table .
Summary of Contents for ONGAS 300/W Series
Page 6: ...Operating Instructions ...
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 28: ...Fault Finding ...
Page 29: ......
Page 30: ......