13
5.3 Electrical installation
5.3.1 Power supply connections and other electrical
connections
Carry out the following steps to ready the unit for
operation:
• Connect the plug of the device to the outlet on
the
generator.
- STO_3 Actuator (optional)
- STO_5 Start
- STO_2 Interface (optional)
- STO_4 Converter connection
- STO_0 Mains connection
- STO_3_1 No function
- STO_6 No function
- STO_1 No function
• Screw the equipotential bonding wire to the PE con-
ductor connection.
Please refer to sections 5.3.2 and 5.3.3.
Only use an earthed mains connection.
For more information about pin assignment refer to
section 10.1.
Attachment for the equipotential bonding