Step 1
17
1
2
3
5
4
17
22
26
19
22
26
17
A. Attach Left and Right Base (1, 2) to Main Base (3) with two M10*90 Bolts (19), four M10
Washers (22) and two M10
Lock Nuts (26).
B. Attach Main Vertical Support (5) to Main Base (3) with two M10*45 Carrige Bolts (17), two
M10 Washers (22) and two M10
Lock Nuts (26).
C. Attach Plate Bar (4) to Left and Right Base (1, 2) with M10*45 Bolt (17).