Installation and operating instructions for
Rail Clamp DR 085/088 FHM
spring activated
– hydraulically released
E 09.797e
Issue: 14.09.2022
Version: 2
Drawn: BAHS
Checked: OHLM
Pages: 39
Page: 24
Tooling: 16 mm A/F wrenches
Procedure:
1. Unlock the 2 locknuts
18
on the two balancing screws
17
(16 mm A/F)
2. Adjust the two screws
17
to distribute the pad gap in relation to the rail.
3. Adjust the two screws
17
so that they exceed by an equal distance (see Fig.2.23) in order to
get the thruster in a horizontal position.
4. After setting apply Loctite on the thread of screws
17
and block the two locknuts
18
then
place
a varnish mark on the latter.
Fig. 2.22
Fig. 2.23
17
rel
ea
se
ac
tiv
at
d
18
rel
ea
se
ac
tiv
at
d