Installation and operating instructions for
Rail Clamp DR 085/088 FHM
spring activated
– hydraulically released
E 09.797e
Issue: 14.09.2022
Version: 2
Drawn: BAHS
Checked: OHLM
Pages: 39
Page: 6
•
For optional cover with built-in unit, only the base plate is mounted.
•
To be removed with the retaining screw on the roller holder according to assembly (see 2.2.3).
•
Please also note the brake catalogue data at www.RINGSPANN.de and the drawings in the
individual paragraph.
2.2 Installing the rail clamp
2.2.1 Tooling list
1. Torque wrench 2000 Nm, socket 46 mm A/F (Bracket attachment).
2. Flat 8mm Hose int. Ø6mm (Bleed ref. 11271-17).
2.2.2 Rail clamp handling
Place the assembly by lifting with the two lifting rings or handling sling if the rail clamp is fitted
with hydraulic power unit (see Fig. 2.2).
Weight for 1 rail clamp approx. 200-350kg see RINGSPANN Datasheet for precise weight.
Fig. 2.1
Fig. 2.2