Ember specification

Before you start

Unpack the appliance and components and check for damage. DO NOT install any damaged items. 

Check all components have been supplied and that you have the correct gas type.

Read these instructions to get an overview of the steps required before starting the installation. Failure 

to follow these instructions could cause a malfunction of the appliance. This could result in serious injury 

and/or property damage.

Ensure the flue termination will meet the required flue clearances as shown in AS/NZS 5601.1 before 

installation.

Ember 600 specification summary

Input   

= 12-23 MJ/h

Output  

= 2.5-5.0* kW

Efficiency 

= 77% (on high)

Heating area  = up to 85 m

2

**

Gas type 

= NG or ULPG

Ember 700 specification summary

Input   

= 14-27 MJ/h

Output  

= 3-6.0* kW

Efficiency 

= 77% (on high)

Heating area  = up to 99 m

2

**

Gas type 

= NG or ULPG

A direct vent inbuilt gas fireplace with a glass front 
and convection fan, pushing warm air from the 
top of the appliance. Operated with an infra-red 
remote control. 

Different burn media and frame options available.

* Will vary according to gas type and flue configuration.

** Will vary depending on geographical location in NZ.

Suitability

Suitable for masonry installations and installations 
into a mock chimney, in open plan areas and living 
rooms.

Data plate

Located on the lower RHS of the base panel in 
front of the gas control.

Convection fan

120 V AC 50 Hz 2-speed centrifugal blower.

Lighting

Halogen lamps 240 V 25 W x 2.

Gas connection

Brass ½ “ BSPT male fitting, the gas supply 
terminates inside the heater—lower right hand 
side of the appliance.

Ignition

230-240 V AC 50 Hz high voltage electronic spark 
generation unit.

Installation considerations

Room size—smaller rooms will heat up quickly, 
and due to the efficiency of the appliance, the 
Ember will turn to a low flame setting once the set 
temperature has been reached.

For efficient performance Rinnai recommends 
installing the fire as close to the floor as possible. 
If the unit is installed higher up the wall the 
movement of air from the convection fan, 
depending on the room configuration, could 
create draughts.

Noise level

: 37-45 dB(A)

Flueing: Masonry

Colinear flexi flue, air intake Ø 75 mm, exhaust  
Ø 100 mm. Appliance must be installed with a 
Rinnai Ember flue system.

Flueing: Mock chimney

Colinear (air intake Ø 75 mm, exhaust Ø 100 mm) 
to coaxial direct vent flueing (inner Ø 100 mm, 
outer Ø 170 mm). Appliance must be installed with 
a Rinnai Ember flue system.

Electrical

This heater has a 1.5 m power cord with a three pin 
plug supplied. The power cord passes through a 
slot in the back left hand corner of the appliance.

•  High 

= 110 W

•  Standby 

= <1W

Safety devices

Flame failure sensing system, pressure relief, 
overheat safety switch, air temperature sensor, 
thermal fuse, overcurrent fuse, and spark 
detector.

Temperature control

Once the unit is turned on the infra-red 
remote* is used to control the flame 
height and heat output.

If the remote is not used the Ember will 
automatically modulate between the 
burner settings to maintain the default 
set temperature of 22 °C.

* Temperature sensor is located in the bottom of the remote

Weights

•  Ember 600 = 51 kg
•  Ember 700 = 55 kg 

Item

Masonry installation

Mock chimney installation

Ember 600

Ember 700

Ember 600

Ember 700

Engine

The Ember engine comes with; remote control (batteries inserted), operation and installation guides, granule packs, rockwool, 

crushed glass, vermiculite, and flexible gas connection.

4-sided or 3-sided frame

Zero clearance frame

Infill panel (if needed)

Infill panel only needed if the cavity is slightly larger than the frame

panel will cover the gap behind the fire and 3-sided frame.

700 Masonry frame

Wider masonry frame for the Ember 700, 

designed to cover a larger cavity opening. 

A must-have for mock chimney installations as it 

gives automatic clearances to combustibles and 

is critical for keeping the installation square.

Burn media

Option of a log or stone set

ensure you 

have the correct set before starting, they are 

different for each model.

Masonry flue components

Flexi flue components for a vertical or 

horizontal chimney termination

Mock chimney flue components

Flue components for a vertical or horizontal 

termination.

23

136 mm

34 mm

depth - 11 mm

Summary of Contents for Ember Series

Page 1: ...Ember Installation guide Models RDV600N RDV600L RDV700N RDV700L ...

Page 2: ...ai co nz www youtube com rinnainz www facebook com rinnainz Important Before you start 4 Ember specification 5 Dimensions 6 Gas and electrical supply 8 Enclosure dimensions 9 Clearances from combustibles 10 TV installation 12 Ember masonry installation overview 14 Ember mock chimney installation overview 16 Installing the zero clearance frame 18 Attaching the flexi flues to the spigot plate 19 Bur...

Page 3: ... unit is installed higher up the wall the movement of air from the convection fan depending on the room configuration could create draughts Noise level 37 45 dB A Flueing Masonry Colinear flexi flue air intake Ø 75 mm exhaust Ø 100 mm Appliance must be installed with a Rinnai Ember flue system Flueing Mock chimney Colinear air intake Ø 75 mm exhaust Ø 100 mm to coaxial direct vent flueing inner Ø ...

Page 4: ...ations Ember 700 with 4 sided frame mock chimney installations 580 640 644 380 590 26 18 287 618 740 380 590 680 18 312 740 644 380 590 26 680 18 312 695 790 95 95 600 658 825 92 5 92 5 700 695 890 95 95 Ember 700 with 3 sided frame masonry installations or mock chimney installations with a hearth 540 mm 500 mm Viewable glass dimensions same for both 600 models 640 mm 500 mm Viewable glass dimensi...

Page 5: ...lled The fire must not be located immediately below a socket outlet potential fire hazard If the supply cord is damaged it must be replaced by a licensed tradesperson This must be a genuine replacement part available from Rinnai Consult a qualified electrician if direct wiring is required as it must comply with AS NZS 5601 and AS NZS 3000 and other relevant local regulations Enclosure dimensions M...

Page 6: ...e the front of the fire or obstruct the fire in any way including the frame around the fire Wall surface above the fire The temperature of the wall surface directly above the fire may get warm and distort paint finishes or distort vinyl wall coverings For durability of surfaces please contact the manufacturer for their specification The below diagrams are to assist people in determining the cleara...

Page 7: ...ension is the minimum clearance required to a mantel The image adjacent shows the dimension from the edge of the frame in the case of the Ember the 400 mm dimension is to be taken from the edge of the glass Always check with the TV manufacturer It is up to the owner to check the TV installation with the TV manufacturer some have warranty conditions that state a TV is not to be installed above a fi...

Page 8: ...r engine with screws using the top and bottom fixings Slide the Ember in place and secure the side brackets to the enclosure using the three outer screw positions on each bracket to the brickwork using suitable fixings not provided Provided with the infill panel or masonry frame 9 Complete the gas connection Make the gas connection 10 Install the burn media and commission Install the glass granule...

Page 9: ...s provided This frame is critical and must be installed as it automatically gives the required clearances to combustibles Refer p 18 for installation details 4 Flue system installed Install the coaxial to colinear adaptor Ensure it is self supported with the frame and screwed in place Attach the intake and exhaust flexi flues to the adaptor clamp and screw into place check clearances are maintaine...

Page 10: ...round the fire 2 Keeps the enclosure square and provides rigidity above the fireplace 3 Allows for a thin profile frame and for the engine to slip easily in and out of the enclosure Attaching the flexi flues to the spigot plate The flexi flues need to be securely fixed to the engine spigot plate using the clamps provided To do this the spigot plate needs to be temporarily removed from the engine u...

Page 11: ...starting Ember 600 stone set laid out in the correct order Adding the glass and vermiculite This step is common to both models and both types of burn media It requires removing the upper burn media tray to access the mesh holding tray 1 Unscrew the left and right tray screws to lift off the upper mesh holding tray 2 Carefully empty the bags of vermiculite and glass into the mesh tray blend togethe...

Page 12: ...the back log onto the two log location brackets at the back of the burner The charred side faces to the front Step 2 Adding the granules and rockwool Place DO NOT POUR the granules ensuring even coverage around the burner ports so as not to cause blockages For the 700 you will need both granule packs for the 600 it s about a bag and three quarters Pinch and roll the rockwool into pea sized balls 6...

Page 13: ...cket back into the burner 1 2 3 4 Step 1 Back row of stones Place the back row of stones as shown Step 2 Middle row of stones Place the middle row of stones BETWEEN the burner ports as shown Step 3 Front row of stones Add the front row of stones inside the grill A few of these will be angled slightly to cover the front of the burner bed Step 4 Adding the granules and rockwool Place DO NOT POUR the...

Page 14: ...ch will be the same regardless of frame type for example 3 sided frame 4 sided frame or the 700 masonry frame 1 Position the frame assembly in front of the engine and connect the CAT5 cable to the frame This connects the push button control panel to the engine s box 2 Slide the two top frame hangers into the corresponding frame slots on the Ember engine and push the lower section into the recess o...

Page 15: ...ity of the installer to check that under normal conditions of the appliance all flue gases are exhausted to the outside atmosphere and that there is no spillage of combustion gases into the room If the appliance cannot be made to perform correctly please contact Rinnai Normal flame pattern Abnormal flame pattern Installation checklist and customer handover Complete the installation checklist in th...

Page 16: ...mm clearance to a combustible surface the underside of the adaptor has zero clearance and can be installed straight into wooden support joists Ø 100 mm exhaust flexi flue Requires a 50 mm clearance to combustibles Ø 75 mm intake flexi flue Requires a 50 mm clearance to combustibles Flue terminal locations Flue terminals must be compliant with the flue terminal locations shown in AS NZS 5601 1 The ...

Page 17: ...er than the vertical 245 410 Flue cowl slides depending on wall thickness 590 Unit height Flue components 1 Ember adaptor R3653 Refer p 30 for clearance to combustible information for the Ember adaptor 2 Mock chimney horizontal flue kit R3654 3 Flue pipe s 150 1000 mm 4 Flue elbow 90 R3643 Max number of 90 bends one 5 Horizontal flashing kit R3646 6 Horizontal wall terminal R3650 Vertical terminat...

Page 18: ...aptor Kit includes high wind roof cowl flue pipes 1200 mm x 3 wall straps x 3 If longer flueing is required order additional flue pipes Masonry chimney flexi vertical flue kit Code R3652 For installation into a masonry fireplace Allows the fire to perform more effectively by achieving a better draw Extends out to 8 m Kit includes flue cowl chimney flashing plate intake flexi Ø 75 mm LHS exhaust fl...

Page 19: ...00 mm R3635 737 mm 953 mm 1200 mm R3636 949 mm 1165 mm Rise Offset Flue kits and components Ember flue adaptor Code R3653 Colinear to coaxial adaptor Contains adaptor locating plate 455 x 455 mm Ø 75 mm and Ø 100 mm flexi flues and four flue clamps Stretches out to 1 2 m Flue elbow 90 Code R3643 Used to facilitate between vertical and horizontal flueing Elbow swivels 360 at base Once joined effect...

Page 20: ......

Page 21: ...Rinnai co nz Experience our innovation 0800 746 624 http www youtube com rinnainz http www facebook com rinnainz Ember Installation Guide 12890 B 02 18 ...

Reviews: