WARNING

The solar hot and solar cold pipes between the solar storage tank and the solar collectors must be 

suited to the high water temperatures and pressures that may occur.  As such, plastic pipe must not 

be used. Components used to join pipes must use metallic materials to achieve sealing.  The collector 

flow and return pipes should be 15mm copper tube.

 Capillary silver solder is a suitable joining method. 

All hot water pipework should be insulated with sealed polyethylene foamed or equivalent insulation to optimise 

performance  and  energy  efficiency.  Such  insulation  may  also  be  mandatory  under  local  regulations.  Rinnai 

recommend insulation to achieve an R value of 0.6 K.m2/W or higher depending on location. With the exception 

of solar collector flow and return pipes, water pipe sizing should be performed in accordance with AS/NZS 3500. 
The suggested maximum combined length of the solar flow and return lines is 40 metres.  Pleaser refer to the 

systems installation manual supplied with the pump kit for the maximum pipe length for the specific pipe kit.
All external pipework MUST be insulated to prevent frost damage.  All fittings MUST be insulated to protect from 

frost damage, with the exception of the air bleed valve. .  

Summary of Contents for Enduro SP200A

Page 1: ...son NOT SUITABLE AS A POOL OR SPA HEATER The solar hot and solar cold pipes between the solar storage tank and the solar collectors must be suited to the high water temperatures and pressures that may...

Page 2: ...as part of complete solar hot water systems Full instructions on the installation of the complete system can be found in the Operation Installation Manual Rinnai Split Solar Hot Water Systems All inf...

Page 3: ...ty OH S 5 Water Quality 5 System Orientation and Inclination 5 Roof Mounting Options 6 Water Pipes and Fittings 9 Collector Installation 11 Standard Installation 11 1 Collector Installation Kit R33202...

Page 4: ...e litres 1 3 1 5 1 6 Number risers 8 10 10 Potential Solar Output at PTR relief conditions kW 1 25 kW 1 25 kW 1 4 kW Frost Protection The Rinnai solar hot water warranty booklet specifies the location...

Page 5: ...rate Warranty Terms and Conditions document for water quality parameters and how they affect the warranty conditions If in doubt about the water quality have it checked against the parameters listed i...

Page 6: ...the instructions in the Rinnai document High Rise Roof Mounting Frame Installation Instructions Part Number 15401103 Standard Installation Installation details are in the section Collector Installati...

Page 7: ...varying wind load parameters such as wind speed and wind direction multipliers The diagram below illustrates the region locations For more information on how to classify site specific wind loading par...

Page 8: ...wind pressures increased by 3 times For installations in roof area 3 a minimum of 0 5m from the edge of the roof is recommended Height limit for all installations is 10 metres For more information on...

Page 9: ...e foamed or equivalent insulation to optimise performance and energy efficiency Such insulation may also be mandatory under local regulations Rinnai recommend insulation to achieve an R value of 0 6 K...

Page 10: ...he collector or leaks WARNING When connecting the collectors with compression unions ensure that the collectors are pushed together so that the olive is sitting approximately 15mm from the end of the...

Page 11: ...sembly Assemble the collector rail components as shown Only loosely attach the collector retainers to the rails Details of component quantities are shown in the tables on page 14 to 19 MOUNTING RAIL C...

Page 12: ...moved Place the collector s onto the roof above the lower rail If more than one collector is being installed then join them together using the compression fittings supplied Push down on the collector...

Page 13: ...e roof purlin using a suitable fastener Position the collector s onto the roof above the lower rail If more than one collector is being installed join them together using the compression fittings supp...

Page 14: ...N Rinnai 14 Split Collector IM 1 COLLECTOR INSTALLATION KIT R33202739 7 12 8 6 12 11 9 10 2 3 2 3 2 3 2 3 1 1 installer supplied copper pipe and insulation not shown installer supplied copper pipe and...

Page 15: ...pression nut and olive 32201711 3 4 Bolt 22601073 M6 Bolt Washer Nut Washer 17401073 Used with collector retainers Nut 16801007 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 28801...

Page 16: ...plit Collector IM 2 COLLECTORS INSTALLATION KIT R33202740 7 4 5 8 6 11 10 9 4 1 1 installer supplied copper pipe and insulation not shown installer supplied copper pipe and insulation not shown 2 3 2...

Page 17: ...1 x compression nut and olive 32201711 4 2 Compression Union 1 x Nipple G compression 2 x compression nut and olive 32201709 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 2880102...

Page 18: ...3 COLLECTORS INSTALLATION KIT R33202741 7 4 5 8 8 8 8 6 12 11 4 5 9 10 4 5 4 5 installer supplied copper pipe and insulation not shown installer supplied copper pipe and insulation not shown 3 2 2 3...

Page 19: ...1 x compression nut and olive 32201711 4 4 Compression Union 1 x Nipple G compression 2 x compression nut and olive 32201709 12 2 Stop End 1 x Plug G Compression 1 x compression nut and olive 2880102...

Page 20: ...ocal call higher from mobile or public phones Hot Water Service Line Tel 1800 000 340 Australia Pty Ltd ABN 74 005 138 769 Internet www rinnai com au E mail enquiry rinnai com au Rinnai has a Service...

Reviews: