40
Interior Wall Preparation
1. Interior:
Using a 3” inch
hole saw, drill the
vent hole guided
by the previously
drilled pilot hole.
2. Exterior:
Continue drilling hole
guided by the
previously drilled pilot
hole.
DRILLING THE VENT HOLE
NOTE: Drill holes level or
sloped downward 2
°
to the
outside. Vent termination
must have outward pitch to
ensure condensation
drains to the outside.
Summary of Contents for Energysaver ES38
Page 1: ...Rinnai ENERGYSAVER Direct Vent Wall Furnace Installation Fundamentals ...
Page 30: ...30 View of Properly Installed Unit ...
Page 50: ...50 Vent Termination OUTSIDE VIEW OF CORRECTLY INSTALLED TERMINATION ...
Page 60: ...60 Extended Venting And High Altitude Installation Procedures ...
Page 74: ...74 Decorative Covers For Vent Extension Kits ...