51
Final Gas Line Preparation
IMPORTANT: Ensure all code and gas line sizing requirements are followed. Shut off
valve should be located in a manner that allows the unit to be removed for field service.
NOTE: If flexible gas line is not used, first complete the next step (sliding the furnace
into place), then attach gas line accordingly.
1. Ensure all connections
are properly tightened
and sealed with pipe
dope or Teflon tape.
2. Attach the included shut off
valve and field supplied
flexible gas line to the wall
supply and furnace. Leak test
all connections.
3. NOTE: Many models will
allow the gas valve to be
positioned behind the back
spacer but still accessible
by the consumer.
ATTACHING THE GAS CONNECTION (Part 2)
Tip: Using a flexible appliance gas line will enable the furnace to be slid into place with minimal effort.
Summary of Contents for Energysaver ES38
Page 1: ...Rinnai ENERGYSAVER Direct Vent Wall Furnace Installation Fundamentals ...
Page 30: ...30 View of Properly Installed Unit ...
Page 50: ...50 Vent Termination OUTSIDE VIEW OF CORRECTLY INSTALLED TERMINATION ...
Page 60: ...60 Extended Venting And High Altitude Installation Procedures ...
Page 74: ...74 Decorative Covers For Vent Extension Kits ...