16
EX38DT Installation and Operation Manual
4.4 Installation Steps
4.4.1 Drill the Flue Hole
Ensure that there are no gas or water lines, or electrical circuits in the wall location where the flue
hole is to be drilled.
Drill the flue hole using a Ø3 1/8 in. (Ø80 mm) drill. A template is provided on the furnace carton
box. The center of the hole must be located anywhere within the shaded area, unless extension kits
are used. See the dimensions diagram.
For weatherboard walls, drill through the center of the weatherboard from the outside first and then
through the plasterboard.
Figure 8
4.4.2 Attach Wall Brackets
Attach the wall brackets as shown. A template is provided.
Figure 9
Example template located on furnace carton box
Figure 10
Ø3 1/8 in.
(Ø80 mm)
Flue Hole
15/16 in. (24 mm)
1 3/16 in. (30 mm)
28 7/16 in. (723 mm)
23 3/8 in. (59
3 mm)
Wall Bracket
Summary of Contents for EX38DT
Page 41: ...EX38DT Installation and Operation Manual 41 8 Parts Cut Away Diagram Figure 58 ...
Page 42: ...42 EX38DT Installation and Operation Manual Exploded View of Service Parts Figure 59 ...
Page 43: ...EX38DT Installation and Operation Manual 43 Exploded View of Service Parts Figure 60 ...
Page 44: ...44 EX38DT Installation and Operation Manual Exploded View of Service Parts Figure 61 ...
Page 45: ...EX38DT Installation and Operation Manual 45 Exploded View of Service Parts Figure 62 ...
Page 46: ...46 EX38DT Installation and Operation Manual Exploded View of Service Parts Figure 63 ...