21
Rinnai Corporation RHFE-201FA
Flue Manifold Installation
6. Lock the ties
Pulling hard on the left and right hand ties,
clip the ties over the notches inside the
sleeve. You should be able to pull the ties 2
or 3 notches past the starting point. Cut the
ties, leaving about 3/4 inch (20 mm) past the
notch. Bend the ties back into the sleeve and
parallel to the wall.
7. Insert Inside Connection Assembly
Push the assemble into the terminal
tube, ensuring that the seal is in place
on the inner tube.
Attach the inside connection with 3
screws. The inner connection can still
be turned to install the screws.
4. Install the Terminal
Check that the terminal seal is in place. For
weatherboard walls, add the second seal next
to the terminal seal to compensate for
weather board angle.
From the outside insert the terminal into the
sleeve with the marking TOP at the top.
The left hand side locking tie should be
marked LEFT .
Terminal seal
Locking tie
Terminal
Locking ties
Sleeve
3 screws
Summary of Contents for RHFE-201FA
Page 24: ...24 Rinnai Corporation RHFE 201FA Cut Away Diagram ...
Page 27: ...27 Rinnai Corporation RHFE 201FA Flow Diagram ...
Page 29: ...29 Rinnai Corporation RHFE 201FA Parts List ...
Page 30: ...30 Rinnai Corporation RHFE 201FA Parts List ...
Page 31: ...31 Rinnai Corporation RHFE 201FA Parts List ...
Page 32: ...32 Rinnai Corporation RHFE 201FA Parts List ...
Page 33: ...Parts List 33 Rinnai Corporation RHFE 201FA ...
Page 34: ...Parts List 34 Rinnai Corporation RHFE 201FA ...
Page 38: ...38 Rinnai Corporation RHFE 201FA ...
Page 39: ......