Installation method
Must read this manual and make sure that
all contents before installation of the produt.
Caution
Please confirm all contents before installation.
Please confirm all contents before installation.
When installing the product, make sure to keep
When installing the product, make sure to keep
distance from inflammables
distance from inflammables
Must be sure to connect the gas displayed on the name table of
Must be sure to connect the gas displayed on the name table of
the product.
the product.
Request authorized engineer or Rinnai agent when you connect
and install the product.
Please check middle valve condition before use.
Must install air ventilator at the place.
Must install air ventilator at the place.
This product discharge a lot of combustion gas, Must install exhaust
gas hood.
- When installing heat proof board contacted inflammable wall between
the product, It can be dangerous of fire accident to use long time.
- Heat proof board should be manufactured and installed as proper type
for the place.(We don’t supply heat proof board)
.
Ceiling or shelf as inflammable : Over 70cm
Side wall as wooden material : Over 20cm
Back side wall as wooden material : Over 30cm
Keep away over 100cm when if exist fire alarm at the place to install
Keep away over 100cm when if exist fire alarm at the place to install.
Heat proof board not installed
Over 20cm
Over 30cm
Over 70cm
Exhaust hood
Exhaust hood
Summary of Contents for RRA-106
Page 1: ...COMMERCIAL GAS RICE COOKER RRA 106 RRA 156 English user manual English user manual ...
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ...ver 150203 ...