RIB2310/RIB2311 Sapphire/Neo Zero Clearance Box Assembly
11955-F 06-14
1
Rinnai New Zealand Ltd.
0800 746 624
Rinnai Australia Pty. Ltd.
1300 555 545
Before installation:
• Unpack the assembly and check for damage—DO NOT install any damaged items
• Check all components have been supplied
• Read these instructions to get an overview of the steps required before starting the installation
Failure to follow these instructions could cause a malfunction of the appliance. This could result in
serious injury and property damage.
3
5
4
2
10
1
10
9
12
8
5
6
2
7
R2340
Item Qty. Description
1
1
ZC box base
2
2
ZC box side
3
1
ZC box top
4
1
ZC box rear
5
1
ZC spigot guide
6
2
Panel burn box guide side
7
1
Air duct outlet gasket
8
1
Spigot top assembly
9
1
Spigot rear
10
2
Edge protector white
11
31
Screw 8x10 AB zinc
12
2
Rivet pop plain73 AS 4.2
Important
To ensure the spigot assembly lines up correctly inside the enclosure and that the appliance is
installed flush, the front edge of the zero clearance box should sit flush with the front edge of the
cladding surface.
The drywall drops down to the level indicated by the two arrows either side of the box.
To put together the full assembly you also need to have the flue spigot (ordered separately).
RIB2310/RIB2311 Sapphire/Neo
Zero Clearance Box assembly