8
EcoGrow Assembly Instructions
Secure the Frame to Foundation
1
Make sure that the frame is
perfectly rectilinear by measuring
the diagonals and verifying that
they are the same.
2
Use a level to make sure that the
frame is level.
Acquire the proper hardware
before beginning the next
procedure. (See page 3.)
Note:
If you are using a base with
filler you may assemble the
greenhouse on a hard surface and
move it to its final position when
you have finished. Make sure that
there are no obstructions between
the assembly area and the final
position.
Wood Deck or Treated Foundation
Insert screws into the frame connector holes and secure them to
the base.
Concrete Foundation
1
Mark the foundation through each connector using a scribe or screw.
2
Carefully move the frame and then drill holes using an appropriate masonry bit. Insert concrete anchors or
expansion anchors (not supplied) in each hole.
3
Move the frame back into place. Make sure that it is still perfectly rectilinear. Secure the screws/anchors in
place.
1
2
1
2
3