8
Prepare Your Parts for Assembly
Lay Out the Greenhouse Frame
Assemble the back portion of the frame with B2 profiles.
Assemble the sides of the frame together with B2 profiles.
Lock the frame together with pins.
Remove everything from your packages and sort them according to part type. Since
assembly is done from taking parts from every box, it is best to put everything together.
Some glazing elements (RA, RB, RC, and RD) are placed inside the long profiles in
the interests of space.
Note:
Protect unassembled panels from the sun to prevent identification stickers from adhering to the glazing.
Decide in which direction the door will face and place the parts on the prepared foundation or wood deck.
Note:
You may find it easier to assemble the base on a flat surface (such as a driveway or a garage) and then
move it into position when you are done.
Note:
Arrange all 2D
connectors with the
stamped word OUT
facing the outside of the
greenhouse.
Slide the SR1 profile into
the B2 frame profile that
will be used for the
doorway.
Note:
Glazing
elements (RA, RB, RC,
and RD) may have
been placed inside
the B2 profiles.
Remove them before
assembly.
2D
B2
B2
7217
7224
7224
466
466