15
Lock the sides of
the PN3 and
PN3A panels and
roof vent in place
using RC2 glazing
elements. Make
sure that the end
of the RC glazing
elements are in
line with the
bottom of the RD
elements.
Finish locking the
panels into place
by placing RC3
glazing elements
across the top of
the roof.
Note:
The RC2 and
RC3 glazing
elements may have
been placed inside
one of the long
profiles.
Important:
In order to maintain the life of your greenhouse, it is essential to insert glazing elements
fully and completely, using soapy water, as explained on page 2.
Remove the ID strips from the panels.
Snap the roof caps
in place on the top
rib intersections.
Note:
If you need
to remove the roof
caps push them on
one side and lift.
3
Note
RC3
RC3