background image

2

Rion GH30 Greenhouse Assembly Instructions

Introduction

Congratulations on purchasing a Rion Greenhouse. We are certain that it will give you many happy years of 

pleasure in your garden.
The drawings in this manual are designed for the greenhouse owner who has purchased a GH33, which 

consists of one front unit (GHF), one back unit (GHB) and one module unit (GHM). If you have purchased 

additional modules (GHM) the instructions are indicated in the text.
The Greenhouse has been designed to be as easy to put together as it is beautiful to look at. Most of the work 

can be done by a single person. Only attaching the roof requires the help of a family member or neighbor for a 

short while.
Easy assembly methods eliminate the need 

for tools or special expertise.

Connect the specified parts.

Match the holes in the profiles and the 

connectors. Place a pin on the pin tool 

and push the pin through the lined-up 

holes to lock the parts in place. Many 

connections require pins on both sides.

Note: 

Extra pins are included.

If you wish to disassemble the parts at 

any time, remove the pins using the pin 

tool. Place the end into the exposed hole 

and lever the pin out.

If a hole in the connector is missing, drill 

a hole with a 6 mm (¼") drill bit through 

the assembled profile and then insert the 

pin.

In extremely rare cases connectors will 

not slip into some round or oval profiles. 

In this case place the affected part into 10 cm of boiling water for 15 seconds before connecting.

Note: 

In some models profiles have identification stickers. We recommend removing them as you work.

Greenhouse assembly is done in the following steps:

Prepare a Foundation for Your Greenhouse 

(page 3)

Identify Greenhouse Parts 

(page 4)

Prepare Your Parts for Assembly 

(page 7)

Lay Out the Greenhouse Frame 

(page 8)

Secure the Frame to Foundation 

(page 9)

Assemble the Roof Pediments 

(page 10)

Assemble Roof Framework 

(page 12)

Cover the Greenhouse Roof 

(page 13)

Raise the Roof 

(page 16)

Cover the Walls 

(page 17)

Seal Panels 

(page 19)

Assemble the Door (Sliding Door Model) 

(page 20)

Attach the Door (Sliding Door Model) 

(page 21)

Assemble the Door (Hinged Door Model) 

(page 22)

Attach the Door (Hinged Door Model) 

(page 23)

Final Touches 

(page 24)

Summary of Contents for GH30

Page 1: ...r greenhouses garden sheds outdoor garden elements and accessories Designed and manufactured by Rion A Member of the Plasson Group Rion Ltd Cabri 25120 Israel Tel 972 4 995 2666 Fax 972 4 995 2677 ema...

Page 2: ...2003 Rion Ltd...

Page 3: ...ll be protected from the wind as much as possible The door should not face prevailing winds When your Greenhouse is fully assembled examine it for sharp edges and trim with a razor knife if necessary...

Page 4: ...tra pins are included If you wish to disassemble the parts at any time remove the pins using the pin tool Place the end into the exposed hole and lever the pin out If a hole in the connector is missin...

Page 5: ...vate and pour concrete in frozen ground Make sure that there is a slight slope for drainage Pour your foundation according to the size of the greenhouse model you have selected Make sure that the foun...

Page 6: ...4 Rion GH30 Greenhouse Assembly Instructions Identify Greenhouse Parts Because of the Greenhouse modularity you may purchase up to three GHM modules to fit your needs...

Page 7: ...nector 4A 2 2 2 2 Right Rib Connector 5A 5 10 15 20 Rib Connector 6A 2 2 2 2 Left Pediment Connector 7A 2 2 2 2 Right Pediment Connector 8A 2 2 2 2 Top Pediment Connector 09 7 7 7 7 T Oval Connector 1...

Page 8: ...ent Panel option 59 9 44 7 cm WIN31 1 1 1 1 Roof Vent WINH 2 2 2 2 Roof Vent Handle GF 55 meters 55 meters 55 meters 55 meters Flexible Glazing Seal DS 1 1 1 1 Door Sealer roll RA1 2 3 4 5 Bottom Roof...

Page 9: ...es are printed with a ruler to help you distinguish between profiles Note Protect unassembled panels from the sun to prevent identification stickers from adhering to the glazing Sliding Door Model 18...

Page 10: ...orway Place a 2D connector on both sides of the prepared B2 frame profile Place the Door13 slider on the side to which you want the door to slide Line up the holes under the holes of the 2D connector...

Page 11: ...e sure that there are no obstructions between the assembly area and the final position Concrete Foundation Mark the foundation through each connector using a scribe or screw Carefully move the frame a...

Page 12: ...de to which you want the door to open Tighten with the included AS80 screws and wing nuts through the connectors Lock the pediment in place using pins and remove the ID strips from the panel Hinged Do...

Page 13: ...Back Pediment Assemble the back top pediment as previously described and lock the parts in place with pins Place the descending profiles on the completed top pediment Slide the three panels in place...

Page 14: ...lace using pins Assemble the rest of the arches according to the number of GHM modules you have purchased Add E2 profiles to the front pediment Lock the parts in place using pins Add E2 profiles to th...

Page 15: ...lace RA1 glazing elements on the top of the roof by placing one end in the top channel and pushing it down along the length of the profile Place RB1 and RB3 glazing elements along the arches where sho...

Page 16: ...op while rolling the element downwards Place each PN3 and PN3A panel in place by sliding one corner into the RD1 glazing element and then continue until it is fully inserted and lying flat Make sure t...

Page 17: ...lazing elements are in line with the bottom of the RD elements Finish locking the panels into place by placing RC3 glazing elements across the top of the roof Remove the ID strips from the panels Snap...

Page 18: ...e 17 Place the roof on the completed frame Note You will need the help of another person for a short while to lift the roof and put it in place Make sure that the roof is in the same orientation as th...

Page 19: ...of the roof Continue with the other PN1 panels Lower the panel towards the frame and slide it into the channel of the base Continue with this procedure until all of the PN1 panels are finished Panel...

Page 20: ...ent Bend the panel until it enters the upper RD1 element Continue with the rest of the PN2 and PN2A panels Lock the lower panels into place using RC1 glazing elements Make sure that the end of the RC...

Page 21: ...Cut it to length Align it with the channel of the column profile with the double ridge facing the panel Push it in to seal the panel using the GT1 glazing tool if needed Continue until all four sides...

Page 22: ...r through the E2 profile in the pin hole Assemble the upper portion of the door noting the direction of the Door12 Slider Put the PN9W panel in place with the plastic ID strip facing outwards Lock the...

Page 23: ...that the bottom of the door is inside the door slider Note If your Greenhouse slides open to the left reverse the orientation of the parts Remove pins where shown Attach the LI2 and LI3 doorstops Make...

Page 24: ...Assemble the upper portion of the door Put the PN9W panel in place with the plastic ID strip facing outwards Lock the door together with pins You may now remove the plastic ID strips Take the roll of...

Page 25: ...ewing in the AS70 screw using the AW5 Allen wrench Screw the Dow2 Door Holder where shown by first removing the pin The end of the door holder should be flush with the inner surface of the round profi...

Page 26: ...er to it if you decide to add options or need to make a repair For your safety and convenience please take note of the following Examine your Greenhouse for sharp edges and trim with a razor knife if...

Page 27: ...25 Notes...

Page 28: ...Rion Ltd Cabri 25120 Israel Tel 972 4 995 2666 Fax 972 4 995 2677 email P rion rion com O homepage P http www rion com MLGH40E 23 November 2003...

Reviews: