13 |
P a g e
7.
Drive one ¼” X 1-1/4” SS lag screw through the pilot holes you drilled.
8.
Repeate steps 8 and 9 for the other side of both U-channels.
9.
Repeat Steps 5 to 9 for the other three corners.
10.
Remove all shims from under the 6x6s.
11.
Tap top of 6x6s with a hammer to settle the 6x6s into the ground fabric.
12.
Using a 4 foot framing Level, check top surfaces of all 6x6s to see if they are level. Use shims as you see necessary to level
all four 6x6s that are sitting on the ground.