5.2. Unloading cautions
Use a suitable lifting fixture to handle, no more
than 2 pallets of modules. Before lifting, check
whether the tray and the carton are damaged
and whether the hoisting ropes are strong and
firm. Two people shall support at the two sides
of the righting carton gently to place it on the
relatively flat position of the project site
Use a forklift to remove the unit from the truck.
During loading or unloading, the forklift must
not hit the packing box.
Place the modules on a level surface.
The stacking of modules at the project site is
prohibited
Place the unit in a dry and ventilated place.
Cover the modules with a tarpaulin to prevent
the package from getting wet.