PV module installation and
maintenance manual
RISEN ENERGY CO.,LTD.
主导部门:组件研发中心
Page:NO.14 ,Total 41
5.3. Secondary transportation and Warning
Do NOT remove the original packages if the
modules require long-distance transport or
long-term storage.
Packaged products can be shipped by land,
sea, or air. During transportation, please fix the
packing box on the transport platform to ensure
that the packing will not roll over. No more than
2 layers by truck normally.
Please do not open the original packing when
transferring the project to the destination.
Please
fix
the
packing
box
on
the
transportation platform to ensure that the
packing box is firmly fixed.
No Transportation of handling by pedicab as
the following.
No handling the module with rope as the
following.
No carrying the module on the back of person