Safety instructions

 

 

PSM overvoltage protection 

 

 EN 

2

 

Safety instructions 

 

2.1 General safety instructions 

Please observe the subsequent general safety 
instructions for the installation and operation of the 
system: 

 

Assembly and installation of the PSM 
overvoltage protection, in particular for wiring 
with mains power, may be performed only by 
a trained electrician. 

 

Please observe the valid regulations for the 
electrical installation of the country in which 
the PSM overvoltage protection is installed 
and operated, and the national regulations 
for accident prevention. Please also observe 
any company-internal regulations, such as 
work, operating and safety regulations. 

 

Use only original Rittal products or products 
recommended by Rittal in conjunction with 
the PSM overvoltage protection. 

 

Please do not make any changes to the PSM 
overvoltage protection that are not described 
in this manual or in the associated manuals. 

 

The operational safety of the PSM 
overvoltage protection is guaranteed only for 
its approved use. The technical data and 
limit values stated in the technical 
specifications may not be exceeded under 
any circumstances. In particular, this applies 
to the specified ambient temperature range 
and IP degree of protection. 

 

The PSM overvoltage protection must not be 
opened. The unit does not contain any parts 
that need servicing. 

 

The operation of the system in direct contact 
with water, aggressive materials or in-
flammable gases and vapours is prohibited.  

 

Other than these general safety instructions, 
ensure you also observe the specific safety 
notes when the tasks described in the 
following sections are performed. 

 
 

 

 

Caution!

Rittal recommends the use of the pre-
assembled connection leads available 
as accessory. 
Ensure the correct positioning of the 
connection plug when making the 
connection! 
There is the danger of electrical shock 
and damage to the connected 
consumers in case of incorrect 
connection. 
The connection plugs that accompany 
the PSM busbars may only be 
installed by trained electricians! 

 
 

2.2 Service and technical staff 

 

The mounting, installation, commissioning, 
maintenance and repair of this unit may be 
performed only by qualified mechanical and 
electro-technical trained personnel. 

 

Only properly instructed personnel may carry 
out service on a unit while in operation. 

  

Summary of Contents for DK 7856.170

Page 1: ...Power System Modul Overvoltage protection DK 7856 170 Assembly and operating instructions ...

Page 2: ...description 4 3 1 Function 4 3 2 Requirement class 4 3 3 Proper use foreseeable misuse 4 4 Transportation and handling 5 4 1 Transport 5 4 2 Unpacking 5 5 Installation and siting 5 5 1 Installation site requirements 5 5 2 Installation 5 6 Technical specifications 6 7 Accessories 6 8 Customer service addresses 6 ...

Page 3: ...e available and on hand for the operating and maintenance personnel 1 3 Symbols in these operating instructions The following symbols are used in this documentation Note Useful information and special features Caution A dangerous situation for which the failure to comply with this note can cause minor injuries or machine damage 1 4 Other applicable documents Installation guide and short operating ...

Page 4: ... values stated in the technical specifications may not be exceeded under any circumstances In particular this applies to the specified ambient temperature range and IP degree of protection The PSM overvoltage protection must not be opened The unit does not contain any parts that need servicing The operation of the system in direct contact with water aggressive materials or in flammable gases and v...

Page 5: ... as possible 3 2 Requirement class The overvoltage protection is designed for requirement class D portable use on power sockets 3 3 Proper use foreseeable misuse The PSM overvoltage protection is used to protect against overvoltage on all three phases The overvoltage protection is provided for the overvoltage category ll in accordance with DIN VDE 0110 Part 1 It is designed for operation in data c...

Page 6: ...tion and siting 5 1 Installation site requirements To ensure the correct function of the unit the conditions for the installation site of the unit specified in section 6 Technical specifications must be observed Electromagnetic interference Interfering electrical installations high frequency should be avoided 5 2 Installation The installation is made in accordance with the plug and play principle ...

Page 7: ...cessories The accessories programme includes a connection cable to connect the PSM overvoltage protection to the power supply A detailed listing of the complete accessories programme is available at the Internet address specified in section 8 Customer service addresses Accessories Model No 3 phase connection cable with CEE plugs IEC 60 309 length 3 m 7856 025 Tab 2 Accessories 8 Customer service a...

Page 8: ...tion n Climate Control n IT Infrastructure n Software Services RITTAL GmbH Co KG Postfach 1662 D 35726 Herborn Phone 49 0 2772 505 0 Fax 49 0 2772 505 2319 E mail info rittal de www rittal com 1 Aufl 02 2013 Zeichn Nr A3102907IT74 ...

Page 9: ......

Reviews: