4
Transportation and
handling
PSM overvoltage protection
5
EN
4
Transportation and handling
4.1
Transport
The unit is delivered in a carton.
Note!
After unpacking, the packaging
materials must be disposed of
in an environmentally friendly
way. They can consist of the
following materials:
Polyethylene film (PE film),
cardboard.
4.2
Unpacking
•
Remove the unit's packaging materials.
Note!
After unpacking, the packaging
materials must be disposed of
in an environmentally friendly
way. They can consist of the
following materials:
Polyethylene film (PE film),
cardboard.
•
Check the unit for any damage that has
occurred during transport.
Note!
Damage and other faults, e.g.
incomplete delivery, should
immediately be reported to the
shipping company and to Rittal
GmbH & Co. KG in writing.
•
Remove the unit from the packaging.
5
Installation and siting
5.1
Installation site requirements
To ensure the correct function of the unit, the
conditions for the installation site of the unit
specified in section 6 "Technical specifications"
must be observed.
Electromagnetic interference
•
Interfering electrical installations (high
frequency) should be avoided.
5.2
Installation
The installation is made in accordance with the
plug-and-play principle.
The preassembled plug must be inserted in the
appropriate socket of the PSM busbar. The
connection to the infeed is made using the cable
DK 7856.025 (available as accessory) or the
connection plug included with the PSM busbar.
Caution!
Rittal recommends the use of the pre-
assembled connection cables
available as accessory.
Ensure the correct positioning of the
connection plug when making the
connection!
There is the danger of electrical shock
and damage to the connected
consumers in case of incorrect
connection.
The connection plugs that accompany
the PSM busbars may only be
installed by trained electricians!